1 / 6

Bruce Mayer, PE Registered Electrical & Mechanical Engineer BMayer@ChabotCollege

Engineering 11. CDR GuideLines. Bruce Mayer, PE Registered Electrical & Mechanical Engineer BMayer@ChabotCollege.edu. Design Presentations. Assumes 4 Member Teams: M1 → M4 Presentations Last 20-30 min Two Members Team Up for Presentation Must Divide Presentation Approx. Equally

sun
Download Presentation

Bruce Mayer, PE Registered Electrical & Mechanical Engineer BMayer@ChabotCollege

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering 11 CDRGuideLines Bruce Mayer, PE Registered Electrical & Mechanical EngineerBMayer@ChabotCollege.edu

  2. Design Presentations • Assumes 4 Member Teams: M1 → M4 • Presentations Last 20-30 min • Two Members Team Up for Presentation • Must Divide Presentation Approx. Equally • Formal Presentations (as would be given to Management or Customers) • Done Using POWERPOINT • Professional ATTIRE • FollowUp → Write Action Item List • WHO will do WHAT by WHEN

  3. CDR Presentation Order  Sp14 • Team ENGELBART • Team SCHMIDT • Team BHATT • Team SIKORSKY • Team McADAM Order Set by MSExcel “RandBetween” Function

  4. PowerPoint Files to Room Computer • Presenting Teams to Supply the PowerPoint file to the Instructor by one of two Methods: • 24Hrs BEFORE the presentation by way of an eMail Attachment • 10 Minutes BEFORE the start of the Presentation class by way of a USB-Drive

  5. Design Presentation - CDR • CONCEPTUAL Design Review (CDR) • By Team Members M1 & M2 • Describe Alternatives Considered • Why the Selected Alternative? • Identify Risks • Concept Drawings and Sketches • Likely Materials • ROUGH $-Cost Estimate • Team Member Assignments → Division of Project Effort

  6. CDR Score Sheet (on WebPage)

More Related