1 / 6

Criteria/Definition for a Complete and Mature P25 Interface

Criteria/Definition for a Complete and Mature P25 Interface. Strawman (of course) Eldon Haakinson. Documents for a Completed P25 Interface.

nanda
Download Presentation

Criteria/Definition for a Complete and Mature P25 Interface

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Criteria/Definition for a Complete and Mature P25 Interface Strawman (of course) Eldon Haakinson Stawman Criteria for Completed P25 Interface

  2. Documents for a Completed P25 Interface • Interface Overview – (normally as a TIA TSB – meaning not a “standard” document in the sense of having normative statements but would have informative statements).  It would also relate to the P25 SOR requirements. • Protocol Specifications – (a TIA 102 normative standard document) detailing messages, algorithms, parameter ranges, etc. Stawman Criteria for Completed P25 Interface

  3. Documents for a P25 Interface – cont’d • Measurement Methods – (a TIA 102 normative standard document) providing step-by-step procedures on measurements associated with the interface. • Performance Recommendations – (a TIA 102 normative standard document) listing the minimum acceptable values for the parameters measured in Measurement Methods Stawman Criteria for Completed P25 Interface

  4. Documents for a P25 Interface – cont’d • Conformance Test Procedures – (a TIA 102 normative standard document) describing how to ensure that equipment built for the interface conforms to the requirements of the Protocol Specifications, the Performance Recommendations, and to specific statements from the P25 SOR. • Interoperability Test Procedures – (a TIA 102 normative standard document) describing the test scenarios and expected outcomes to ensure that two pieces of equipment that are on either side of the P25 interface actually interoperate based on P25 standards. Stawman Criteria for Completed P25 Interface

  5. Criteria for a Mature P25 Interface • Documentation – The above set of documents would be available for the interface or there would have to be ample explanation why a specific document is not necessary • Review and Revision Process – The above set of documents may be undergoing improvements in the text by the P25 Committees to produce new versions of the documents (a typical process even for a completed standard) Stawman Criteria for Completed P25 Interface

  6. Criteria for a Mature P25 Interface cont’d • Products Available – The above set of documents would have been used by multiple vendors to provide products to the marketplace and users. • User implementation – Users would have been implementing systems and using equipment that are based solely on the above set of documents for each P25 interface of the implemented P25 system and equipment Stawman Criteria for Completed P25 Interface

More Related