1 / 6

NERC OC Update

NERC OC Update. Greg Park, NWPP (In place of Rich Hydzik ) WECC EPAS Meeting June 4, 2018. Subcommittee Updates. Operating Reliability Subcommittee (ORS) Working on an RC coordination document (could be of interest in WECC) Resources Subcommittee (RS)

Download Presentation

NERC OC Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NERC OC Update Greg Park, NWPP (In place of Rich Hydzik) WECC EPAS Meeting June 4, 2018

  2. Subcommittee Updates • Operating Reliability Subcommittee (ORS) • Working on an RC coordination document (could be of interest in WECC) • Resources Subcommittee (RS) • FERC issued its final rule on primary frequency response • Final rule referenced Primary Frequency Control Guideline • Event Analysis Subcommittee (EAS) • Asked for two compliance guidance task forces • TOP-001-4 R10.3 and R10.6 – Assigned to ORS – Non-BES data collection • TOP-001-4 R20 and R23 – Data redundancy in control center and testing • TOP-010 R3 – Data Quality task force will succeed the RTATF TOP-010 R13 task force • Personnel Subcommittee (PS) • Concern over ILA’s and keeping them current

  3. Subcommittee Updates • Essential Reliability Services Group • Technical and Policy Briefs were approved and posted to ERSWG site • Measure 1, 2, and 4 Forward Looking Technical Briefs • Measure 1, 2, and 4 Forward Looking Policy Briefs • Measure 6 Forward Looking Technical Brief • Measure 6 Historical Analysis • Measure 3 Summary and Recommendation Brief • DER Data Collection Technical Brief • ERSWG has completed its assignments – no new assignments (yet) • Measure 1 – Synchronous Inertia Response at Interconnection Level • Measure 2 – Initial Frequency Deviation Following Largest Contingency • Measure 3 – Synchronous Inertia at BA Level • Measure 6 – Net Demand Ramping Variability

  4. Task Force Updates • Real Time Assessment Task Force (RTATF) • OC approved Compliance Guidance in December 2017 • Document is at NERC awaiting RE/ERO approval • Methods for Establishing IROL Task Force (MEITF) • General progress is on Standards Development page • Inverted-based Resources Performance Task Force (IRPTF) • Ryan Quint to Call in today

  5. Lessons Learned Since 2/7/2018 OC Meeting • LL20180302 Breaker Failure Due to Trip Coil Polarity • LL20180301 State Estimator Outages Requiring Tuning/Calibrating EMS Settings • LL20180101 Inadequate Battery Configuration Management Damaged a Generating Station and Tripped an HVDC Conversion Station

  6. Questions and Answers

More Related