1 / 11

NERC Update

NERC Update. August 2013 ISAS Meeting Kathy Anderson. Current Ballots. Project 2007-17.2: Protection System Maintenance and Testing – Phase 2, Reclosing Relays (PRC-005- 3) – Open August 14-23, 2013 Project 2012-05: ATC Revisions – MOD A (MOD-001-2) – Open August 16-26, 2013

banyan
Download Presentation

NERC Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NERC Update August 2013 ISAS Meeting Kathy Anderson

  2. Current Ballots • Project 2007-17.2: Protection System Maintenance and Testing – Phase 2, Reclosing Relays (PRC-005- 3) – Open August 14-23, 2013 • Project 2012-05: ATC Revisions – MOD A (MOD-001-2) – Open August 16-26, 2013 • Project 2010-01: Training (PER-005-2) – Open August 23-September 3, 2013 • Project 2013-04: Voltage and Reactive Control (VAR-001-4, VAR-002-3) – Open August 23-September 3, 2013

  3. Posted for Comment • Project 2007-17.2: Protection System Maintenance and Testing – Phase 2, Reclosing Relays (PRC- 005-3) – July 10-August 23, 2013 • Project 2008-12: Coordinate Interchange Standards (INT-006-4, INT-009-2, INT-010-2, and INT-011- 1) – July 25-August 23, 2013 • Project 2012-05: ATC Revisions – MOD A (MOD-001-2) – July 11-August 26, 2013 • Project 2010-01: Training (PER-005-2) – July 19-September 3, 2013 • Project 2013-04: Voltage and Reactive Control (VAR-001-4, VAR-002-3) – July 19-September 3, 2013

  4. Posted for Comment • Project 2010-03: Modeling Data – MOD B (MOD-032-1 and MOD-033-1) – July 22-September 4, 2013 • Project 2010-04: Demand Data – MOD C (MOD-031-1) – July 22-September 4, 2013 • Project 2010-17: Definition of Bulk Electric System (Phase 2) – August 6-September 4, 2013 • Project 2012-13 NUC Five-Year Review (NUC-001-2) – July 26-September 9, 2013 • Project 2009-03: EOP Five-Year Review (EOP-001-2.1b, EOP-002-3.1, EOP-003-2) – August 6- September 19, 2013

  5. Posted for Comment • Project 2010-02: FAC Five-Year Review – August 1-September 16, 2013 • FAC-001-1 and FAC-002-1 • FAC-003-3, FAC-008-3, FAC-010-2.1, FAC-011-2, FAC-013-2, FAC-014-2 • Project 2010-14.1: Phase 1 of Balancing Authority Reliability-based Controls: Reserves (BAL-002-2) – Open August 2-September 16, 2013 • Project 2012-09: IRO Five-Year Review (IRO-003-2, IRO-004-2, IRO-005-4, IRO-006-5, IRO-006-East, IRO-008-1, IRO-009-1, IRO-010-1a) – August 7-September 20, 2013

  6. Upcoming Ballots • Project 2010-03: Modeling Data – MOD B (MOD-032-1 and MOD-033-1) – August 26-September 4, 2013 • Project 2010-04: Demand Data – MOD C (MOD-031-1) – August 26-September 4, 2013 • Project 2010-17: Definition of Bulk Electric System (Phase 2) – August 26-September 4, 2013 • Project 2010-14.1: Phase 1 of Balancing Authority Reliability-based Controls: Reserves (BAL-002-2) – Open September 6-16, 2013

  7. MOD A Efforts • The “MOD A” initiative continues. Drafting team has been selected. Information can be found on NERC’s website at http://www.nerc.com/pa/Stand/Pages/Project201205MODAAvailableTransferCapability.aspx • The standards being revised are:·  MOD-001-1a – Available Transmission System Capability·  MOD-004-1 – Capacity Benefit Margin·  MOD-028-1 – Area Interchange Methodology·  MOD-029-1a – Rated System Path Methodology·  MOD-030-2 – Flowgate Methodology

  8. Project 2008-12 ― Coordinate Interchange Standards • Informal Comment period ended August 23, 2013. The Coordinate Interchange Standard Drafting Team (CISDT) was seeking additional input on the appropriate disposition of requirements in the current approved INT standards that were identified by stakeholders as candidates for consideration under criteria developed by the Paragraph 81 drafting team. This input will assist the team in finalizing revisions to the standards prior to posting for a formal 45-day comment period and initial ballot.

  9. Project 2008-12 ― Coordinate Interchange Standards • Group plans to meet in September to review comments received during the informal comment period. • More information can be found at http://www.nerc.com/filez/standards/Project2008-12_Coordinate_Interchange_Stds_Modifications.html

  10. For More Information • For more information: http://www.nerc.com/filez/standards/Reliability_Standards_Under_Development.html

  11. Questions??????

More Related