1 / 8

NERC Update

NERC Update. January 2013 ISAS Meeting Kathy Anderson. Current and Pending Ballots. Project 2010-14.1: Phase 1 of Balancing Authority Reliability-based Controls: Reserves (BAL-012-1 Operating Reserve Policy) – (Opened 1/4/13 – 1/14/13)

wolfe
Download Presentation

NERC Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NERC Update January 2013 ISAS Meeting Kathy Anderson

  2. Current and Pending Ballots • Project 2010-14.1: Phase 1 of Balancing Authority Reliability-based Controls: Reserves (BAL-012-1 Operating Reserve Policy) – (Opened 1/4/13 – 1/14/13) • Project 2007-09: Generator Verification (PRC-024-1 Generator Performance During Frequency and Voltage Excursions) – (Opened 1/2/2013 – 1/11/2013) • Project 2010-11: TPL Table 1, Footnote B - (Opened 1/2/2013 – 1/11/2013)

  3. Current and Pending Ballots • Project 2013-02: Paragraph 81 – Recirculation Ballot (Open January 8 – January 17, 2013) • On September 30, 2011, the North American Electric Reliability Corporation (NERC) filed a petition with the Federal Energy Regulatory Commission (FERC) requesting approval of its proposal to make informational filings in a “Find, Fix, Track and Report” (FFT) spreadsheet of lesser-risk, remediated possible violations of Reliability Standards. On March 15, 2012, the FERC issued an order conditionally accepting NERC’s FFT proposal.

  4. Project 2013-02 – Paragraph 81 • Consistent with Paragraph 81 of the order, a draft Standards Authorization Request (SAR) was drafted to set forth criteria and a process to identify Reliability Standard requirements that either: (a) provide little protection to the Bulk Electric System; (b) are unnecessary or (c) are redundant; and, thereafter, to have NERC file to retire the identified Reliability Standard requirements with appropriate governmental authorities.

  5. Project 2013-02 – Paragraph 81 • In addition to addressing P81, the SAR was drafted consistent with what the SPIG developed as Recommendation No. 4, as set forth in NERC’s Recommendations to Improve The Standards Development Process on page 12 (April 2012), which states: • Recommendation 4: Standards Product Issues — The NERC board is encouraged to require that the standards development process address: . . . The retirement of standards no longer needed to meet an adequate level of reliability.

  6. Project 2013-02 – Paragraph 81 Requested Retirements: • BAL-005-0.2b R2 • CIP-003-3 R1.2 • CIP-003-3 R3 • CIP-003-3 R3.1 • CIP-003-3 R3.2 • CIP-003-3 R3.3 • CIP-003-3 R4.2 • CIP-003-4 R1.2 • CIP-003-4 R3 • CIP-003-4 R3.1 • CIP-003-4 R3.2 • CIP-003-4 R3.3 • CIP-003-4 R4.2 • CIP-005-3a R2.6 • CIP-005-4a R2.6 • CIP-007-3 R7.3 • CIP-007-4 R7.3 • EOP-005-2 R3.1 • FAC-002-1 R2 • FAC-008-1 R2 • FAC-008-1 R3 • FAC-008-3 R4 • FAC-008-3 R5 • FAC-010-2.1 R5 • FAC-011-2 R5 • FAC-013-2 R3 • INT-007-1 R1.2 • IRO-016-1 R2 • NUC-001-2 R9.1 • NUC-001-2 R9.1.1 • NUC-001-2 R9.1.2 • NUC-001-2 R9.1.3 • NUC-001-2 R9.1.4 • PRC-010-0 R2 • PRC-022-1 R2 • VAR-001-2 R5

  7. Posted for Comment • Project 2010-14.1: Phase 1 of Balancing Authority Reliability-based Controls: Reserves (BAL-012-1 Operating Reserve Policy) – (Opened 11/30/12 – 1/14/13) • Project 2007-09: Generator Verification (PRC-024-1 Generator Performance During Frequency and Voltage Excursions) – (Opened 12/12/2012 – 1/11/2013) • Project 2010-11: TPL Table 1, Footnote B - (Opened 12/10/2012 – 1/11/2013)

  8. For More Information • For more information: http://www.nerc.com/filez/standards/Reliability_Standards_Under_Development.html

More Related