1 / 10

Wind Energy in Bulgaria ‘from gold rush to standstill’ or ‘from 0 MW to 14,000 MW and back again’

Sebastian Noethlichs, EWEA 2011. Wind Energy in Bulgaria ‘from gold rush to standstill’ or ‘from 0 MW to 14,000 MW and back again’. Wind Energy in Bulgaria. Starting conditions Decent wind conditions Variable, indexed, 15 year feed-in-tariff Fixed exchange rate 2007 EU accession:

Download Presentation

Wind Energy in Bulgaria ‘from gold rush to standstill’ or ‘from 0 MW to 14,000 MW and back again’

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sebastian Noethlichs, EWEA 2011 Wind Energy in Bulgaria ‘from gold rush to standstill’ or ‘from 0 MW to 14,000 MW and back again’

  2. Wind Energy in Bulgaria • Starting conditions • Decent wind conditions • Variable, indexed, 15 year feed-in-tariff • Fixed exchange rate • 2007 EU accession: • EU2020 targets • EU funding • Euro-Zone accession perspective  Instant viability

  3. Wind Energy in Bulgaria • What happened? Realistically: 2000 – 3000 MW by 2020 Operating 300 MW Installed 500 MW Licensed 1673 MW Pre-Contracted 3285 MW ‘Planned’ 14000 MW BG maxload 7000 MW

  4. Wind Energy in Bulgaria • What happened?

  5. Wind Energy in Bulgaria • Result • Overburdening of authorities • Reaching of technical capacity • Fear of ‘overshooting the target’  Political backlash

  6. Wind Energy in Bulgaria • Political Backlash • Existential threats and uncertainties • New renewable energy law  increased development risk • Agricultural land ban  threat to regional existence

  7. Wind Energy in Bulgaria • New Renewable Energy Law • Annual capacity allowances • 2,500 EUR/MW • Refundable? • 25,000 EUR/MW • Non-refundable EIA EIA engineering engineering connection connection wind potential wind potential operation operation capacity allocation land rights land rights land use land use permitting permitting connection pre-payment construction construction max. 1 year

  8. Wind Energy in Bulgaria • Agricultural Land Ban • Artificial obstruction • Threat to vast majority of projects under development • Virtual freeze in North-Eastern region 100% All Agricultural Land 66,143 km2 12% UnusedLand 7,800 km2 48% Category 1 - 4 Land 31,593 km2 0.02% Land for Renewable Energy 5.3 km²

  9. Wind Energy in Bulgaria • Summary 1. Instant viability 2. Rapid development 3. Political backlash • New framework • more restrictions, more state control • Our goal: • ‘unpleasant but workable’ • minimize risk and cost to all stakeholders

  10. Wind Energy in Bulgaria Thank you for your attention! info@bgwea.org 1 Kuzman Shapkarev Street Sofia, 1000 Bulgaria