An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Meeting the Challenge:Ballast Water Management Jim Mackey Hyde Marine, Inc. NAMEPA Sustainable Maritime Development Conference 30 October 2013

  2. Introduction - Hyde Marine • Subsidiary of Calgon Carbon Corp. • Hyde Marine maritime equipment supplier since 1865 • Experience in ballast water management since 1996 • First technology accepted into USCG STEP in 2008. • One of 1st IMO Type Approved BWTS (April 2009) by MCA (UK Flag) • One of first to get USCG Alternative Managment System (AMS) Approval (April 2013) • Currently 280 units sold, including 30 retrofit projects 6 GUARDIAN Systems for Royal Navy CVF Carriers USCG STEP Approval Coral Princess USCG AMS Approval First BWTS installed M/S Regal Princess First Hyde GUARDIAN M/S Coral Princess CCC acquisition Hyde Marine & Univ. Michigan BW Study 1996 1998 2000 2002 2004 2006 2008 2010 2012 2013 GUARDIAN Modular System M/S Celebrity Mercury >200 units sold BWTS Installed on 4 commercial ships IMO Type Approval Great Lakes BWT Demo Project

  3. The issue To stop the spread of aquatic invasive species through the management of ships’ ballast water. • 3 to 5 BILLION tons of ballast water annually. • Thousands of species of plants and animals found in ballast water. • It is estimated that a new species • is introduced somewhere in the world every 9 weeks. • Invasions likely irreversible.

  4. Regulations U.S. Coast Guard • Implemented June 23, 2012 • All commercial ships >1600 GT discharging ballast in U.S. waters • BWTS must have AMS approval or full USCG approval • New Builds starting 1 Dec 2013, Retrofit starting 1 Jan 2014 • Ratification pending • D2 standards enforced 1yr after ratification • Applies to all vessels above 400 GT excluding military vessels • Retroactive for new builds built after 2009 with <5000 m3 ballast capacity and all new builds built after 2012 • Vessels built before 2009 with ballast capacities 1500-5000m3 starting 2014 and with capacities <1500m3 and >5000m3 starting 2016 International Maritime Organization (IMO) • e.g. Great Lakes, Malaysia, Australia, etc. • Varies from ballast water exchange to full D2 standard; investigate port destinations Local Regulations

  5. Why haven’t ship owners rushed out to buy Ballast Water Treatment systems? • Depressed global shipping market. • Delayed IMO BWMC ratification. • Uncertainty caused by US State and Federal regulations • Lack of harmonization between IMO and USCG • Confusion about US EPA/USCG Regulations • Evolving USCG Type Approval/ETV testing process • USCG Alternative Management System (AMS) is no guarantee of USCG Type Approval  Risk to owner. • Potential higher standards in future  Risk to owner

  6. BWTS are expensive and difficult to install, increase cost and complexity of ship operations, and offer no ROI. • MANY questions remain for the owner: • Class/Flag requirements. Plan Approval. Risk Assessment. • Port State Control requirements and expectations. • Sampling and compliance testing challenges. • Equipment performance and reliability. Limited data in all operating conditions and in continuous operation.

  7. Time for a reality check • US EPA and USCG Regulations are coming into force starting in January 2014. Ship owners who visit US ports face rapidly approaching compliance deadlines. The train is coming!

  8. Retrofit challenge • Deciding when to start and how to proceed... USCG/EPA IMO? ? Start Now. Gain experience.

  9. Retrofit Timeline • System Selection • Pre-Engineering • Ship Visit / Walkthrough • Negotiation and purchase • Site-specific engineering • Submittals • System Delivery • Pre-Fabrication / Prep • Installation • Commissioning Base Timeline for Installation: 270 Days

  10. Equipment Selection • Equipment selection is a complex issue. • Choose a reliable BWTS Manufacturer. Experience, reputation, financial strength, service network. • Approvals and Certifications. Test results, and transparency of data. • CAPEX and OPEX. • Choose appropriate Technology for the type and crew • Choose appropriate Technology for the expected operating environment route of vessel. • Safety of vessel and crew.

  11. Filters – efficiency and reliability. UV - Low or medium pressure Electrochlorination Advanced Oxydation Chemical Ozone Deoxygenation Others Treatment Process

  12. Installation Challenges • Limited installation resources in the marine engineering and installation sectors. • Need to develop the people and skills • Need to continue to develop new tools and techniques • Considerations • Ballast pump flow rate and pressure • Available electrical power • Available space for equipment • Optimal piping arrangement • Access into the machinery space • Is a dry-docking needed or install by riding crew • Communication with vessel automation system • If chemicals are required where to install tanks

  13. New Tools – Laser Scanning and 3D Modeling

  14. Operational Challenges • Considerations • Effect on vessel operation & turn-around • Maintenance intervals and downtime • Specialized training of crew and officers • Water salinity and cold temperature • Managing Extreme conditions - high sediment, algea blooms, etc. • Holding time for chemical treatment. • Ensure active substance are fully neutralized and no chemical is discharged • Special safety and logistical considerations • Unique operations

  15. Avoid the Train Wreck • Establish a project team with as much experience as possible. • Project Manager • Engineering partner • Installation partner • Equipment supplier • Begin early. • Make a plan and stick to it!