An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMWG Update to WMS 3-7-12 M Wagner Edison Mission Marketing & Trading

  2. CMWG Met 3-6-12 • TSAT update– in service 3-6-12 in DA for RT 3-7 • CRR Model Build Document—comments received/submitted, ERCOT committed to respond with updated doc • CRR Auctions • draft NPRR to allow TAC to determine bid limits • CRR Subgroup—rolling auction proposals under development with ‘right sized’ credit • ERCOT is drafting an NPRR on annual auctions—splitting out the first and second year into two periods

  3. CMWG 3-6 Mtg Update Continued • Heuristic table for electrically similar buses—ERCOT developing NPRR on posting the table • 2 step SCED Mitigation—ERCOT analysis • Discussed permutations to the analysis based on the table presented last month • No results yet—looking at different shift factor cutoffs for effective generation to resolve constraint and using a distributed slack bus

  4. CMWG 3-6 Mtg Update Continued • 69kV management discussion—CRR auctions are selling CRRs on lines where in RT the constraints are not enforced • Issue appears to be a Transmission Operating procedure that results in deactivation of a line when there is a Mitigation Plan and no gens w/ SF > 2%

  5. Ongoing • Potentially Interim CMWG meeting to look at Constraint Competitiveness test…