the ilcta mdb horizontal test stand for srf cavities
Download
Skip this Video
Download Presentation
The ILCTA_MDB Horizontal Test Stand for SRF Cavities

Loading in 2 Seconds...

play fullscreen
1 / 8

The ILCTA_MDB Horizontal Test Stand for SRF Cavities - PowerPoint PPT Presentation


  • 108 Views
  • Uploaded on

The ILCTA_MDB Horizontal Test Stand for SRF Cavities. Andy Hocker FNAL-TD AEM, 25-JUN-2007. Horizontal Testing --- Context. Fail!. Cavity Fabrication. Surface Processing. Vertical Testing. Fail!. Pass!. Horizontal Testing. Surface Processing. Cavity Dressing. Pass!.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'The ILCTA_MDB Horizontal Test Stand for SRF Cavities' - francesca


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
horizontal testing context
Horizontal Testing --- Context

Fail!

Cavity Fabrication

Surface Processing

Vertical Testing

Fail!

Pass!

Horizontal Testing

Surface Processing

Cavity Dressing

Pass!

Cold String Assembly

AEM

mdb lay of the land
MDB: Lay of the Land

Horizontal test area for ILC

RF Hut

Vertical Test area for HINS

AEM

hts cave and rf hut
HTS Cave and RF Hut

WG switch

charging supply

300 kW klystron

modulator

RF waveguide (1.3 and 3.9 GHz)

LHe/LN2 feed can

Horizontal Test Cryostat (HTC)

High power pulsed RF system (operated w/ CC2 for > 1 yr)

AEM

typical hts test cycle
Typical HTS test cycle
  • Install cavity in HTC
  • Warm, off-resonance coupler conditioning (high pulsed power processing)
  • Cooldown to 1.8 K
  • On-resonance conditioning of coupler/cavity
  • Map out Q0 vs Eacc curve
  • Test new widgets, etc.
  • Warmup
  • Remove cavity
  • Goal: ~10 day turnaround

Geophones (ILC CM vibration R&D)

AEM

c22 prep dressing
C22 prep (“dressing”)

Cavity tuner installation

Installation of cold part of input coupler at CAF-MP9 clean room

Ready to install in HTC

Installation of warm part of input coupler

AEM

first measurement at hts
First measurement at HTS
  • Room-temperature measurement of fundamental passband modes
  • Zoom of “pi-mode” (accelerating mode)

AEM

status and plans
Status and plans
  • Struggling with cavity cooldown
    • Identified a leaky liquid level probe as culprit, repairing this week, go for cooldown again
  • Finishing up RF distribution/interlock checkout
    • Installing WG shutters to allow for multi-cave (HTS and CC2) configuration
    • Finishing up safety paperwork, final walk-through soon
  • After RF checkout, begin commissioning
    • Execute HTS test cycle (~1 month)
  • Declare open for business
    • First customer: FNAL third-harmonic (3.9 GHz) cavity for DESY’s FLASH facility
    • 1.3 GHz cavities for first US-built ILC CM as schedule allows