1 / 9

Status of CERN tests

Status of CERN tests. Naoki Kimura for the FTK group. Motivation. Dual-HOLA, IM and DF combined test at CERN f or coming FTK G lobal I ntegration on this summer (Jun to Sep). These modules are the most up stream of FTK system .

eze
Download Presentation

Status of CERN tests

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of CERN tests Naoki Kimura for the FTK group

  2. Motivation • Dual-HOLA, IM and DF combined test at CERN for coming FTK Global Integration on this summer (Jun to Sep). • These modules are the most up stream of FTK system. • Early phase test of input boards using real data are important. Need a many debug. • Its are the input for downstream modules, so these should be work simple and robust.

  3. Previous VS test @ CERN We did the Vertical Slice using first prototype boards and real data at CERN 2012-2013. ATLAS Run Control • Receive real ROD outputs from SCT @ P1. • ROD data receiving with required input data speed is successful in ATLAS environment. • Received data was correctly processed by some FTK prototype boards. • Data sending to ROS was checked by • on ATLAS TDAQ system, and ATLAS Run Control worked without error form FTK. Vertical Slice Test

  4. Test Hardware Setup We used Dual-HOLA => Input mezzanine (IM) => Data Formatter (DF) => ReareTrandition Module (RTM) => ROS setup using latest test boards. Current TEST Setup

  5. Test Hardware Setup For pseudo data FILAR Input Mezzanine (IM) Dual-HOLA Current TEST Setup SCT Pixel (IBL ) ROD ROS PC Data Formatter (DF) Rear Transition Module (RTM) ROBIN card

  6. Test Results Data format and L1ID was checked by ROS. Saved outputs are compared with simulated expectation. DF ROS ROD IM RTM Filer, SCT, Pixel, IBL PC : Control and Spy monitoring for debug • Both SCT and Pixel cluttering on IM, and data treatment and transfer to the ROS on DF were confirmed by pseudo data form Filer. Lab4 • Pixel/SCT data from Dual-HOLA installed Pixel/SCT ROD are received and correctly clustered. ROS save these data without ERROR and outputs are consistent with simulated expectation. P1/SR1 • IBL data are received and sent to ROS without ERROR. IBL clustering FW is under development. SR1

  7. DF test with ATCA crate Currently DF boards are working standalone with additional power supply, but finally DF boards are installed to ATCA for the high speed data sharing on each boards. DF board on ATCA crate • Some ATCA tests are done at Lab4 • DF boards are inserted to ATCA and power is supplied by ATCA crate. • Hot-swap functionality is confirmed. • Net work access to DF board via ATCA switch board is checked.

  8. CERN combined test team Waseda INFN AUTH U.Chicago AUTH Waseda

  9. Summary • Dual-HOLA, IM, DF and RTM combined tests are going smoothly. • Data receiving, clustering and sending test are successful. Future Plan • We will continue the combined test toward global integration. • Error treatment, more robust monitoring, latency check • More powerful FW development • Multi inputs, log time, heavy events tests etc

More Related