HBD construction status. I. Ravinovich for Weizmann group. The final design of HBD. The design of the vessel is basically finished. The engineering drawings for the parts of the vessel are basically done. The small parts like: HV holders for SHV; gas inserts;
E N D
HBD construction status I. Ravinovich for Weizmann group I. Ravinovich
The final design of HBD • The design of the vessel is basically finished. • The engineering drawings for the parts of the vessel are basically done. • The small parts like: • HV holders for SHV; • gas inserts; • inserts for the GEM modules screws; • screws for the GEM modules; are in production. • Now they are working on the design of the jigs I. Ravinovich
The final design of HBD I. Ravinovich
The final design of HBD I. Ravinovich