1 / 10

Perencanaan Penempatan FACTS Optimal Dengan Menggunakan Algoritma Genetika

Perencanaan Penempatan FACTS Optimal Dengan Menggunakan Algoritma Genetika. Oleh : Damis Hardiantono , S.T., M.T. KONSENTRASI TEKNIK ENERGI PROGRAM STUDI TEKNIK ELEKTRO. Saran dan Perbaikan : Prof. Dr. Ir. H. Muh . Tola , M. Eng.

eros
Download Presentation

Perencanaan Penempatan FACTS Optimal Dengan Menggunakan Algoritma Genetika

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PerencanaanPenempatan FACTS OptimalDenganMenggunakanAlgoritmaGenetika Oleh : DamisHardiantono, S.T., M.T. KONSENTRASI TEKNIK ENERGI PROGRAM STUDI TEKNIK ELEKTRO

  2. Saran danPerbaikan :Prof. Dr. Ir. H. Muh. Tola, M. Eng 1. Apakahperalatan FACTS seperti UPFC, TCSC dan SVC memilikiciri-ciritersendiri ? Solusi (page 12) : Sumber : “Flexible AC Transmission System”, page 3, Zhang et. al., 2006. Back Next

  3. Lanjutan : Prof. Dr. Ir. H. Muh. Tola, M. Eng 2. Dari peralatan FACTS seperti UPFC, TCSC dan SVC manakah yang paling efektif ? Solusi (page 12) : Sumber : “FACTS Modelling and Simulation in Power Networks”, page 5, AnriqueAcha et. al., 2004. Back Next

  4. Saran danPerbaikan :Dr. H. Suarga, M. Math., M. Sc 1. Lengkapidenganblock diagram untuksistemsoftware yang dibuat. Solusi (page L-17) : Back Next

  5. Lanjutan : Dr. H. Suarga, M. Math., M. Sc 2. Lengkapidengan flowchart untukanalisisalirandayaMetodeNewton-Raphson. Solusi (page 22) : Back Next

  6. Lanjutan : Dr. H. Suarga, M. Math., M. Sc Berdasarkanflowchart analisisalirandayaMetodeNewton-Raphsonmakadapatdijelaskansebagaiberikut (page 20) : • Untuk bus PQ, dimanaPischdanQischditentukan, nilaiawal magnitude dansudutfasetegangandisetsamadengannilai bus tadahyaituVi(0) = 1.0 danθi(0) = 0.0. . Untuk bus PV, dimanaVidanPischditentukan, sudutfasenyadisetsamadengansudutfasetegangan bus tadah, yaituθi(0) = 0.0. . • Untuk bus PQ, Pi(k) danQi(k) dihitungdengan (22) dan (23), kemudianΔPi(k)danΔQi(k)diperolehdengan (34) dan (35). • Untuk bus PV, Pi(k) danΔPi(k)berturut-turutdihitungdengan (22) dan (34). • Elemen-elemenmatriksJacobiandihitungmenggunakanpersamaan (26) sampaipersamaan (33). • Menyelesaikanpersamaan linear simultanpadapersamaan (25) secaralangsungdengancarafaktorisasi triangular daneliminasiGauss. • Nilai magnitude dansudutfasetegangan yang barudihitungdenganpersamaan (36) dan (37). • ProsesberulangsampaiselisihdayaΔPi(k)danΔQi(k)lebihkecildaritingkatakurasi yang ditentukan, yaitu : atau : • Hasilperhitungantegangandanrugi-rugidayadenganmenggunakanpersamaan (38). Back Next

  7. Saran danPerbaikan :Prof. Dr. Ir. H. SalamaManjang, MT Periksakebenaran ABSTRAK bahasaasingdenganvalidasipada Lab. PusatBahasa UNHAS sertakoreksiterhadapkata-kata yang masihsalah. Solusi (page vi): ABSTRACT DamisHardiantono.The Planning of Optimal FACTS Allocation by Using Genetic Algorithm (Supervised by H. SalamaManjang and H. NajamuddinHarun) The tesis aimed to : 1) determine the part of power system that requires the allocation FACTS (Flexible Alternating Current Transmission System) devices by using Genetic Algorithm (GA); 2) analyzed the influence of FACTS devices allocation base on the result of power supply on the power losses and voltage system. The optimal FACTS allocation in the power system was conducted by optimization method with Genetic Algorithm. The variables were optimized by minimizing the power losses on the system. The results revealed that: (1) The optimum SVC was allocated at bus 26 (GI Barawaja) with a rating by 20 MVAr, while the TCSC was allocated at line 26 (GI Soppeng – GI Sidrap) with a rating by -0,7Xline; (2) The allocation of FACTS devices at these places could correct the collapse volatge at bus 24 (GI Tello B 30 kV) from 0.805 pu to 1.047 pu, at bus 26 (GI Barawaja) from 0.690 to be 0.985 pu, and at bus with critical voltage on bus 29 (GI Bontoala) from 0.945 pu to be 0.994 pu; and (3) The total power loss on the line before the optimal FACTS allocation was 20.487 MW and this value was decreased to 17.394 MW after the optimal FACTS allocation. Keywords : Optimization, FACTS devices, Genetic Algorithm Back Next

  8. Saran danPerbaikan :Prof. Dr. Ir. H. NadjamuddinHarun, MS 1. Seharusnyapadatabel 4, nilaiteganganpadaslack bus tegangannyaharussama ! Solusi (page 59) : Back Next

  9. Lanjutan : Prof. Dr. Ir. H. NadjamuddinHarun, MS 2. Perhitungananalitikkebutuhandayareaktif FACTS . Solusi (page 60) : Jadikapasitasperalatan FACTS yang harusdipasangberdasarkanperhitungananalitikyaitusebesar 20,19 MVAr. Sedangkanberdasarkananalisispenempatan FACTS optimal menggunakanAlgoritmaGenetikayaitusebesar 20 MVAratauprosentasekesalahansebesar 0,9%. Back Next

  10. TerimaKasih