Section 1 Master Timeline (Day 1-10). Day-By-Day Key Activities Description. . . . Joe Howard. Day 1. Orbit 3 Drop off TDRSS coverage but keep transponder on and configured between GN passes Orbit 4 Verify sun pointing acquisition Turn on ALI outgas heater Turn on IRU heater

boris-dean
Download Presentation

Section 1 Master Timeline (Day 1-10)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Section 1 Master Timeline (Day 1-10)

  2. Day-By-Day Key Activities Description . . . Joe Howard

  3. Day 1 • Orbit 3 • Drop off TDRSS coverage but keep transponder on and configured between GN passes • Orbit 4 • Verify sun pointing acquisition • Turn on ALI outgas heater • Turn on IRU heater • Turn on AST • Turn on GPS • Orbit 6 • Allow ACS to use Kalman filter if converged • Night Orbits • Check TDRS 4,6,8 Kbps telemetry • Launch • Fairing Separation • First Acquisition through TDRSS at 2k from ATS Non_Coherent • Test Command through TDRSS • AOS McMurdo • Test Command through McMurdo • LOS McMurdo ATS goes to TDRSS • Separation From Launch Vehicle into B-dot Mode • Solar Array Deployment • AOS Norway at 2k Send Command to switch rate to 32K • Switch to ATS Buffer B • Playback SSR Launch Data • Close Data Set I • Monitor B-dot

  4. Day 2 • Orbit 12 • Update M5 time if needed • Orbit 14 • Move Solar Array 10 deg off index • Start ACE Safehold • Monitor safehold control • Orbit 16 • Exit safehold • Turn back on IRU heaters • Turn back on AST power • Turn back on GPS power • Turn back on ALI outgas heater • Use Kalman filter • Orbit 17 • Acquire Earth pointing mode • Orbit 18 • Use GPS for timing in M5

  5. Day 3 • Orbit 20 • Load ATS • Turn off Slew control for safety • Orbit 28 • Enable slew logic • Orbit 29 • Pitch Slew out Settle 15 minutes and return (Execute from ATS)(TDRSS) • Orbit 31 • Yaw Slew out and back (from ATS)(TDRSS) • Orbit 32 • Roll Slew out and back (from ATS)(TDRSS) • Orbit 34 • Enable EFF in Monitor mode

  6. Day 4 • Orbit 45 • Turn on X-band RSN • Turn on X-band RF without WARP RF exciter • Playback S-band WARP RS422 data • Orbit 46 • Dump WARP files X-band (Norway and SGS overlap) • Orbit 49 • Re-dump WARP X-band data (Wallops) • Orbit 50 • WARP Memory test • Orbit 37 • Load ATS • Orbit 41 • Update any Power parameters • Turn off ALI radiator heaters • Allow DeltaV logic to execute • Orbit 42 • Monitor 60 second thruster burn from ATS (over Wallops) • Orbit 43 • Turn back on the ALI rad heaters • Orbit 44 • Turn on WARP and format memory • RS-422 test

  7. Day 5 • Orbit 60 • Enable RTSs for ALI cover opening DCE via ATS • Orbit 61 • One 8 second and two 30 sec DCE execution out of ATS (out of view) • Move cover to outgas position • Turn Heaters on to outgassing mode • Turn on Radiator Heaters • Orbit 62 • S-band dump of 8 sec DCE • Another 30 sec DCE via ATS • Orbit 64 • X-band dump of all ALI data • Orbit 52 • Load ATS • Orbit 55 • Turn on ALI • Turn off ALI radiator heaters • Orbit 56 • ALI comprehensive test • Orbit 57 • 8 second ALI lamp cal • S-band WARP replay • 30 second test pattern ALI data collect • Orbit 58 • X-band WARP playback • Orbit 59 • Release Launch Latch for ALI Cover • Release Launch Latch for ALI Diffuser • Open ALI Cover • Close ALI Cover

  8. Day 6 • Orbit 66 • Load ATS • Orbit 70 • Close ALI cover • Turn off ALI radiator heater • Orbit 71 • Increase FDC limits in prep for Delta V • Allow for Delta V to execute • Orbit 72 • Monitor 13 minute Delta V via ATS (TDRSS scheduled as needed) • Orbit 73 • Reset FDC limits • Orbit 74 • Re-open ALI cover • Re-turn on ALI radiator heaters • Orbit 75 • Turn on ALI • Orbit 76 • AC Dark Earth image at TEC 1 for S-band downlink • Orbit 77 • AC image at TEC 1 for S-band downlink • Orbit 78 • AC Dark Earth image at TEC 1 for X-band downlink • Orbit 79 • AC image at TEC 1 for X-band downlink • Test TDRSS pass at 4 Kbps • Orbit 80 • Test TDRSS pass at 6 Kbps • Orbit 82 • Test TDRSS pass at 8 Kbps • Orbit 83 • Load ATS • X-band playback of AC data

  9. Day 7 • Orbit 84 • Power on Hyperion • Release WARP files with AC data • Orbit 85 • Test ASPs • Test HYP Lamps • Orbit 86 • HYP short internal cal • Orbit 87 • HYP Cryo static drive test • S-band playback of short cal • Orbit 88 • HYP heater test • Orbit 89 • Heaters back to normal • Orbit 90 • Cover open full • Cover open to sun cal position • cover close

  10. Day 8 • Orbit 92 • Load ATS • Orbit 99 • HYP full length cal • Orbit 100 • Close ALI cover • Turn off ALI radiator heater • X-band dump of Hyperion data • Allow for Delta V to go • Orbit 101 • 12 min Delta V from ATS • Orbit 103 • Open ALI cover • Turn on ALI radiator heater • Release Launch Latches on LFSA • Deploy LFSA • Orbit 104 • Another full length Hyperion cal • Orbit 107 • X-band playback of Hyperion data to Wallops

  11. Day 9 • Orbit 109 • Load ATS • Orbit 114 • Close ALI cover • Turn off ALI radiator heater • Allow for Delta V to execute • Monitor 9 minutes Delta V • Orbit 115 • Return ACS to 60 second burn limit • Orbit 116 • Open ALI cover • Turn on ALI radiator heater • Orbit 117 • HYP Cryo check start • Orbit 118 • HYP Cryo check stop • Orbit 119 • Hyperion heaters on for outgassing

  12. Day 10 • Orbit 121 • Load ATS • Orbit 129 • All instrument DCE (Procedure or ATS) • Orbit 130 • X-band downlink (Alaska) • Orbit 131 • X-band downlink (Wallops) • Orbit 132 • All instrument short DCE • Orbit 133 • S-band dump of short DCE