fast track n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
FAST TRACK PowerPoint Presentation
Download Presentation
FAST TRACK

Loading in 2 Seconds...

play fullscreen
1 / 8

FAST TRACK - PowerPoint PPT Presentation


  • 205 Views
  • Uploaded on

FAST TRACK. tracking system Presentation. Acrobatics get in motion Artistes perform in front of big projection screens or float freely in the space over the heads of the audience. Live act and video projections blend together and have an effect of an exorbitant presentation.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'FAST TRACK' - zilya


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
fast track
FAST TRACK

trackingsystem

Presentation

Acrobatics get in motion

Artistes perform in front of big projection screens or float freely in the space over the heads of the audience. Live act and video projections blend together and have an effect of an exorbitant presentation.

Fast Track is a vertical rail and sledge system and was developed by TEAM EXTREME, primarily for artistic performances. There are unlimited possibilities for the creation of new forms of expression by the artistes. The coordination of horizontal and vertical rides at different speeds is the basis for

2-dimensional movements. The artists float through space apparently with weightlessness and can be positioned at any imaginable point of a given level.

4 passive sledges with single rope technology, computer control

fast track1
FAST TRACK

trackingsystem

sledge

SLEDGE

Passive, filigree tracking system

Horizontal and vertical movements up to 4m/sec.

Respectively 2 highspeed winches are responsible

for controling

Drives are exactly programmable, 2-D software

Artistes are performing in their flights

Programmed, choreographed, dynamic arial images

Almost soundless sledgerides

fast track2
FAST TRACK

trackingsystem

technicalspecifications

Trussingtype - 50 x 50 cm 4-point traverse

1 raillineisneeded per artist

According to theshowtherecanbemounted 2 raillines on 1 traverseline

Length and distance of thesledges to eachotheris variable

Thetrussingsystemmustbefixedagainstslinging

Total inducedforces:

Per pulley (diverterpulley/sleigh) at one point

At horizontal und vertikal steelrope, Fh= weightforce + dynamic

(artist 70kg (incl. ballast und costume) force incl. dyn ~ 1,5 kN, so Fh~1,5kN

Fres ~ 2,1kN resultant

Measurements of winches

length 1345 mm, width 100 mm, height 905 mm

weight 600 Kg / winch

fast track3
FAST TRACK

trackingsystem

technicalspecifications, setup

Setup

Position of winchesareusually on theground

Theartist will befixedwith 2 ropes on his artisticbelt, left and right

Expenditure of time 1-2 days

theperiod of programmingisabout 8 hours

Adjustment of light programming, about. 3-4 hours

Cherry picker and forkliftisneeded

fast track4
FAST TRACK

trackingsystem

technicalspecifications, power

Power400V three-phase current 50 Hz, with proper neutral and earth must be assured!1 or 2 125 A CEE plug next to the winches, fused 125A time lag, with no other power consumers on this fuses.

It depends on number of winches.

Generator

If the power is provided by local generator its power capacity should be at least 120KVA, depends on the number

of winches as well. No other power consumers on this generator as well. 

R C D

It is very important that there is no RCD or any other earth leakage protector of any kind in the whole power line!

If any existing RCD is not detachable, there must be a transformer to get ground free. The transformer must be

capable of 120 KVA, but depends on the number of winches.

There are no other power consumers allowed after the RCD, even if the generator would be big enough.

Any power failure is definitely serious and will end the show.

Any power failure during set-up or rehearsals will cause considerable delay.

In any case there will be no danger to artist or any participants.

fast track5
FAST TRACK

trackingsystem

operatorplace

Operator place

1 desk / platform 1 x 2m, 2 chairs

220 V electricity

3 data cables will be installed

between the winches and the

operator location.

outdoor

Additional 1 Pavillion3 x 3 m

with walls.

At cold temperatures appropriate

heating is necessary.

It is very important, that at any time the operator has a free sight to the action area.

Theactionarea and thespace of thewinches

mustbeseparatedagainstanyaccess.

fast track6
FAST TRACK

trackingsystem

flights / performance

  • Flight of an artist on sledgesystem
  • LANXESS ARENA

BAUMA MUNICH

fast track7
FAST TRACK

trackingsystem

technicalteam

  • Technicaldirector
  • Planningcreation of CAD 3D plans
  • Safe actionwhile show, setup and dismantling
  • Systemcontrol ( winches,rigging)
  • Computer-spcialists
  • Show programming and showoperator
  • Adjustment of theprogramming to variable conditions as:
  • Music, changingnumbers of artistes, different heights and formations
  • Production Manager
  • Entirecoordinationartist an technics
  • Responsibleforsafety of artists and showaction