Work Progress Yassine LASSOUED y.lassoued@ucc.ie. Layout. Work Packages Status Update Difficulties Deliverables Data Model Implementation Future Plan. Layout Work Packages Status Update Difficulties Deliverables Data Model Implementation Future plan. Work Packages.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Work Progress Yassine LASSOUED y.lassoued@ucc.ie' - yule


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Work Progress

Yassine LASSOUED

y.lassoued@ucc.ie

GeoDI Progress Meeting 3

layout
Layout
  • Work Packages
  • Status Update
  • Difficulties
  • Deliverables
  • Data Model
  • Implementation
  • Future Plan
  • Layout
  • Work Packages
  • Status Update
  • Difficulties
  • Deliverables
  • Data Model
  • Implementation
  • Future plan

GeoDI Progress Meeting 3

work packages
Work Packages

WP1: Initiate & Identify

T1.1 Review data and applications

T1.2 User needs and prioritised data

T1.3 Metadata and quality issues

T1.4 Data familiarisation and review

T1.5 Technical issues

WP2: Review

T2.1 Review ontologies and CVs

T2.2 Identification of standards and models

T2.3 Review ontology languages & tools

T2.4 Review international best practice

T2.5 Review state of the art ontology matching

WP0

Project Management

T0.1 Co-ordination of technical implementation of the project

T0.2 Administration and financial management

T0.3 Communication and dissemination strategy

WP6: Synthesise

T6.1 Assess analyses and services

T6.2 Tools for geospatial analysis

WP3: Specify Models

T3.1 Specify integrated data models

T3.2 Specify ontologies

T3.3 Ontologies and models validation

T3.4 Prototype & benchmarking

T3.5 Ontology matching techniques

WP5: Implement & Evaluate

T5.1 Implement ontology server

T5.2 Implement ET tools

T5.3 Prototype integration & evaluation

WP4: Specify System

T4.1 Data delivery methods

T4.2 Process changes for improved management

T4.3 system specification

GeoDI Progress Meeting 3

status update
Status Update
  • WP0
    • GeoDI Web site: http://geodi.ucc.ie
    • Reporting: monthly, interim
    • Liaising with Griffith
      • Griffith Steering Meeting (02 July 2009)
      • Internal meetings
    • Liaising with JuDJuT
      • 2 internal meetings at CMRC
    • Recruited 4C postdoctoral researcher for the Ontology Matching position
    • Generated a book chapter from GeoDI and Griffith deliverables
      • Chapter: Atlas Interoperability
      • Book: ICAN Handbook

GeoDI Progress Meeting 3

status update1
Status Update
  • WP1
    • Finalised D1.1 (Review of Geoscientific Datasets)

GeoDI Progress Meeting 3

status update2
Status Update
  • WP2
    • Tasks T2.1 – T2.3: Completed
      • Deliverable D2.1: Review of Ontologies and Controlled Vocabularies
        • Reviewed by MI, but needs to be finalised
      • Deliverable D2.2: Identification of Standards and Data Models
        • Reviewed by MI, but needs to be finalised
      • Deliverable D2.3: Review on Ontology Languages and Tools
        • Reviewed by MI, but needs to be finalised
    • Task T2.4: In progress (80% completed)
      • Deliverable D2.4: Review of International Best Practice…
        • Internal review before submission to MI

GeoDI Progress Meeting 3

status update3
Status Update
  • WP3
    • T3.1 (Integrated Data Models)
      • Initial data model sent for review by OSU & USGS
      • Data model based on Arc Marine
    • T3.4 (Prototype Implementation and Benchmarking)
      • Installed and tested PostgreSQL/PostGIS
      • Wrote SQL script for installing Arc Marine (PostgreSQL)

 To be published on the Arc Marine web site

      • Installed Arc Marine on PostGIS

GeoDI Progress Meeting 3

difficulties
Difficulties
  • Data Modelling
    • Data complexity (relationships)
    • Data heterogeneity

 Need to design a model that supports all the types of information available in the existing datasets

    • “Many” options for modelling

 Selected option that “makes the most sense”

    • Domain knowledge

 Support from CMRC experts (Max Kozachenko & Gerry Sutton)

GeoDI Progress Meeting 3

deliverables
Deliverables
  • D1.1: Review of Geoscientific Datasets
    • Finalised and submitted to MI

GeoDI Progress Meeting 3

deliverables1
Deliverables
  • D2.1: Review of Ontologies and CVs
    • Content:
      • Introduction
      • Introduction to CVs and Ontologies
      • Existing CVs and Ontologies
        • GSI, BGS, USGS, NASA, SeaDataNet, etc.
      • Ontology Use Cases
        • Interoperability, ETL, Semantic Frameworks
        • Projects: ICAN, GCMD, OTEG, InterRisk, etc.
    • Size: 50 pages
    • Status:
      • Reviewed by MI (WebEx call)
      • No major edits required

GeoDI Progress Meeting 3

deliverables2
Deliverables
  • D2.2: Identification of Standards and Data Models
    • Content:
      • Introduction
      • Standards
        • Organisations: W3C, ISO, OGS, CEN, INSPIRE
        • Standards: Metadata, Data, Ontologies, Information Exchange
        • Recommendations
      • Data Models
        • Arc Marine, GeoSciML, Arc Geology
      • Initial Recommendation on Data Model for GeoDI
    • Size: 30 pages
    • Status:
      • Reviewed by MI (WebEx call)
      • No major edits required

GeoDI Progress Meeting 3

deliverables3
Deliverables
  • D2.3: Review of Ontology Languages and Tools
    • Content:
      • Introduction
      • Introduction to Ontologies
        • Definition, Semantic Web, Uses of Ontologies
      • Ontology Languages and Query Languages
        • RDF, RDF-S, SKOS, OWL, SPARQL, Recommendations
      • Ontology Tools
        • Editing, Servers, APIs, Other Tools
    • Size: 32 pages
    • Status:
      • Reviewed by MI (WebEx call)
        • Need to elaborate more
        • Need examples from the geoscientific domain

GeoDI Progress Meeting 3

deliverables4
Deliverables
  • D2.4: International Best Practice
    • Content:
      • Introduction
      • Important Developments in the Management of Large Marine Geoscientific Datasets
        • Bathymetric Attribute Grid, OGC TCWG
      • Example Projects Showcasing International Best Practice
        • SIOExplorer, Marine Geoscience Data System
    • Size: Currently 22 pages
    • Status:
      • Under review by CMRC
      • To add: Chapter on Grid Technology (CMRC)

GeoDI Progress Meeting 3

data model
Data Model
  • Based on Arc Marine
  • Six packages:
    • Business Information
    • Geo Points
    • Samples
    • Geo Lines
    • Measurements
    • Raster

GeoDI Progress Meeting 3

data model1
Data Model

Arc Marine

GeoDI

GeoDI Progress Meeting 3

implementation
Implementation
  • Current:
    • Database implementation on PostgreSQL
      • Arc Marine implemented
      • To do: implement the GeoDI model
      • Load data into the geodatabase
      • Testing and benchmarking
  • Future:
    • Ontology-based automatic or semi- ETL (4C)
    • Options:
      • Prototype for a Geo Grid Library (Geo-GLibrary)
      • Prototype for an ontology based data discovery and delivery system

GeoDI Progress Meeting 3

planning for next 6 months
Planning for Next 6 Months
  • WP2
    • Finalise D2.3 & D2.4
  • WP3
    • Implement data model
      • Meeting with MI users?
    • Feed the geodatabase
    • Validate data model
    • Start work on automatic ETL tools (4C)
    • Develop ontologies
    • Integration of GeoSciML and Arc Marine?

GeoDI Progress Meeting 3

planning for next 6 months1
Planning for Next 6 Months

GeoDI Progress Meeting 3