Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes

Loading in 2 Seconds...

play fullscreen
1 / 14

Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes - PowerPoint PPT Presentation


  • 62 Views
  • Uploaded on

Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes . 14 th December 2011 MICO170 meeting. MICE major Infrastructure milestones. Downstream spectrometer solenoid base plate installation complete. All step IV base plates installed:

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes' - yosefu


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
step iv infrastructure update stfc tim hayler eddie holtom norbert collomb graham stokes

Step IV Infrastructure updateSTFCTim HaylerEddie HoltomNorbert CollombGraham Stokes

14th December 2011

MICO170 meeting

Tim Hayler

downstream spectrometer solenoid base plate installation complete
Downstream spectrometer solenoid base plate installation complete

All step IV base plates installed:

Upstream spectrometer base plate (in beam and out of beam)

AFC base plate (in beam and out of beam)

Downstream spectrometer base plate (in beam only, there will be no possibility of moving the downstream spectrometer out of beam)

Tim Hayler

tof cage and virostek plate bracket design complete
TOF cage and Virostek plate bracket design complete

Detail drawings of the bracket design are complete.

We have worked closely with the Spectrometer team to make sure all the necessary compliance is in the design e.g. The way the brackets fasten to the Spectrometer and positioning of the TOF cage.

Currently going through the tendering process.

Expect delivery in march 2012

Tim Hayler

tof cage and virostek plate test support stand
TOF cage and Virostek plate test support stand
  • Support frame to test:
  • The bracket assembly to the TOF cage and Virostek plate.
  • TOF detector assembly, movement of the detector on the sliding mechanism.
  • The mechanical arm for removing the split ring
  • Expect the need to do some re-work on the Virostek plates, split rings, drill and tap holes, some machining
  • Expect to start the build in March 2012

Tim Hayler

afc rolling platform tests complete
AFC rolling platform tests complete
  • Testing specification for the MICE Moving Platform:
  • Ensure the platform raises and lowers and moves horizontally
  • Leak check/pressure drop check (Hydraulic system)
  • Ensure the platform raises sufficiently to permit moving the unit without interference
  • Visual inspection of components under load regarding deformation
  • There are no unforeseen failures of components
  • The moving of the platform along its intended path

Tim Hayler

afc rolling platform tests complete1
AFC rolling platform tests complete

4 tonne load test done at Daresbury Lab

Hydraulic jacks raise the platform.

Roller stakes move the platform in and out of the beam.

Final testing needs to be done in the MICE hall early 2012

Tim Hayler

the radiation s hield
The Radiation Shield

The review presentation is on the technical board website, meeting minutes 21st November 2011. http://mice.iit.edu/tb/Meetings/2011-11-21/

Tim Hayler

spectrometer solenoid stand
Spectrometer Solenoid stand

Support frame design is being worked on at RAL with close collaboration with the Spectrometer team

Tim Hayler

spectrometer solenoid stand1
Spectrometer Solenoid stand

The Spectrometer team will now provide the SS with just the four support feet shown. This helps with shipping issues.

The frame will be built in the UK and installed in the MICE hall as part of the Step IV build

Tim Hayler

local magnetic shielding for the mice hall compressors and beyond
Local magnetic shielding for the MICE hall compressors and beyond

Prototype being made in mild steel for a fit check

Tim Hayler

ready for afc and ss installation 30 03 2011
Ready for AFC and SS installation30/03/2011
  • The readiness date for the AFC and SS installation is very much dependant on the MICE hall schedule of events.
  • We want to install all the moving platforms for step IV
  • Can we move the KL detector downstream to progress the Engineering build in the first SS position? First raised at the TB, 21st Nov meeting, slides by Ken Long http://mice.iit.edu/tb/Meetings/2011-11-21/
  • Are we taking beam in the first quarter of 2012?
  • What is the Hydrogen project doing?
  • What other work is scheduled for the first quarter 2012?
  • In building up the Infrastructure we would expect unknowns, items lost and unforeseen events. It would be very useful to start the work in January.

Tim Hayler