1 / 20

The system’s costs are projected at which stage of the SDLC? Planning and Analysis Design

The system’s costs are projected at which stage of the SDLC? Planning and Analysis Design Implementation Operation and Maintenance. Answer: (b). Which of the following is not the essential characteristic of the strategic types of information?

yael
Download Presentation

The system’s costs are projected at which stage of the SDLC? Planning and Analysis Design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The system’s costs are projected at which stage of the SDLC? • Planning and Analysis • Design • Implementation • Operation and Maintenance Answer: (b)

  2. Which of the following is not the essential characteristic of the strategic types of information? • Simulated “what if” information of a short-term nature • Competitive actions • Demographic studies • Customer actions Answer: (a)

  3. Which of the following is not the essential characteristic of Decision Support System? • Output directed to organization personnel at all levels • Comprehensive database • Adaptive system over time • None of these Answer: (d)

  4. In project management, which of the following does not show precedence relationship among the tasks and milestones of the project? • Gantt Chart • PERT • CASE Tools • None of these Answer: (a)

  5. Which of the following is not the layer in data warehouse architecture? • External database layer • Metadata layer • Data staging layer • None of these Answer: (d)

  6. Which of the following is the approach that a data mining tool uses? • Association • Classification • Clustering • All of the above Answer: (d)

  7. In MICR how many digits are available for amount? • 13 • 11 • 10 • 9 Answer: (a)

  8. Real tile gross settlement system is • Net settlement system • Designated–time settlement system • Designated-time net settlement system • None of these Answer: (d)

  9. What is the message flow structure in our RTGS System? • V • Y • L • T Answer: (b)

  10. Which of the following is the queue processing and reordering in RTGS? • FIFO • Bypass FIFO • FIFO with prioritization • All of the above Answer: (d)

  11. Which of the following is not correct for SFMS? • Uses Text messages • Uses server signing PKCs • Uses server encryption PKCs • Access can be restricted to HTTPS Answer: (a)

  12. Which of the following is not the type of smart cards? • Stored Value Cards • Re-loadable and disposable cards • Closed and open stored value cards • None of these Answer: (d)

  13. In RTGS, IDL is • Intra Day Liquidity • Inter-bank Debit List • Instrument Debit List • None of these Answer: (a)

  14. FEDWIRE is a • Net settlement system • Gross Settlement system • Deferred net settlement system • Deferred gross settlement system Answer: (b)

  15. CHIPS is a (a) Net settlement system (b) Gross settlement system (c) settles in forex currency only (d) a & c both Answer: (a)

  16. Structured Financial Messaging System (SFMS) is for • Inter-bank messaging • Intra Bank messaging • RTGS • All of the above Answer: (d)

  17. Electronically, customers fund can be transmitted across the bank by • CENTRALISED BANKING SYSTEM • SFMS • RTGS • ATMS Answer: (c)

  18. Which of the following is not the basic objective of the System Audit? • Safeguarding assets • Maintaining process integrity • Maintaining data integrity • None of these Answer: (d)

  19. Which of the following functionality can be accomplished by generalized audit software? • Evaluating the quality of data • Evaluating the quality of system processing • Analytical review • All of the above Answer: (d)

  20. Which of the following technique is used for concurrent audit? • Integrated Test facility (ITF) • System Control Audit Review File (SCARF) • Continuous and Intermittent Simulation (CIS) • All of the above Answer: (d)

More Related