1 / 23

INFORMS 2012 Identifying and Prioritizing Shared Corridor Technical Challenges

INFORMS 2012 Identifying and Prioritizing Shared Corridor Technical Challenges. Brennan M. Caughron Graduate Research Assistant Rail Transportation and Engineering Center (RailTEC) University of Illinois at Urbana-Champaign.

yael
Download Presentation

INFORMS 2012 Identifying and Prioritizing Shared Corridor Technical Challenges

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INFORMS 2012Identifying and Prioritizing Shared Corridor Technical Challenges Brennan M. Caughron Graduate Research Assistant Rail Transportation and Engineering Center (RailTEC) University of Illinois at Urbana-Champaign

  2. INVESTIGATING TECHNICAL CHALLENGES AND RESEARCH NEEDS RELATED TO SHARED CORRIDORS FOR HIGH-SPEED PASSENGER AND RAILROAD FREIGHT OPERATIONS • Project Description: • New high speed rail (HSR) developments in the U.S. need to address technical challenges of shared rail corridors in the North America rail environment • The objectives of this project are to identify shared rail corridor technical challenges, existing and on-going research, knowledge gaps and research needs • Impact on the Railroad Industry: • Reducing the operational and program deployment risks associated with shared rail corridors • Identification of critical areas to address in planning new HSR systems • Expediting the process of developing efficient and safe HSR shared corridors with better prioritization in planning Research Sponsor: BROAD AGENCY ANNOUNCEMENT BAA-2010-1 Research and Demonstration Projects Supporting the Development of High Speed and Intercity Passenger Rail Service

  3. Methodology Phase 1 Phase 2 Phase 3 • Initial Assessment • Define project scope • Identify areas/categories and preliminary list of shared rail corridor technical challenges • Detailed Assessment • Conduct brainstorming interviews with experts • Prepare a prioritized list of technical challenges • Knowledge Gaps & Research Needs • Identify previous and on-going research related to top-priority challenges • Identify knowledge gaps and research needs To other research programs

  4. Shared-Use Corridor Operating Configurations Freight or conventional passenger rail service High-speed rail service Adjacent trackcenters >25’ ≤ 200’ Shared track & shared ROW • Shared track: tracks shared between passenger and freight or other service. • Shared right of way (ROW): dedicated high-speed passenger tracks separated from freight or other service tracks up to 25’ • Shared corridor: dedicated high-speed passenger tracks separated from freight or other service tracks by 25-200’ Adjacent trackcenters ≤ 25’ Shared corridor

  5. Shared Rail Corridors:SAFETY

  6. Track Center Spacing • Track center spacing has risk exposure implications • Typical spacing on freight lines is around 14 feet, but can be as low as 11’ and in areas with no ROW constraints as high as 25’ • Areas of concern include: • Adjacent track derailments • Safety of maintenance of way (MOW) and train operating (TY&E) employees • Capacity effects of maintenance on adjacent tracks • Aerodynamic effects of higherspeed trains

  7. Wayside Defect Detection • Wayside detectors can identify problems with rolling stock • Can be reactive or predictive • Dragging equipment • Shifted loads • Wheel bearing condition • Wheel contour • Brake condition • Numerous technologies • Acoustic • Thermal • Machine vision • Potential risk management strategy on shared corridors with more stringent standards

  8. Highway Grade Crossings • Types of enhancements • Long-arm gates • Median barriers • Four quadrant gates • Incursion detection • Grade separation or crossing closure required above 125 MPH • Closures inconvenient and unpopular • Bridges expensive • May disrupt nearby residentsand business

  9. Shared Rail Corridors:INFRASTRUCTURE &ROLLING STOCK

  10. Traffic Loading Response Loads Demand Preliminary analysis by Brandon Van Dyk based on NEC WILD data Wheel loads Type • Static • Dynamic (track deflection, curving) • Impact (flat wheels, frog gaps ) Characteristics • Magnitude • Frequency • Cycles Response - elastic or plastic Demand - varies with speed and type of traffic

  11. Track Structure Design Response Loads Demand • Superstructure • Rail • Fasteners • Insulators • Pads • Crossties • Substructure • Ballast • Subgrade • Special trackwork • Turnouts • Crossings • Track transitions

  12. Track Geometry • US FRA regulates track geometry based on maximum train speed • Higher speeds require more stringent geometry and more frequent inspection and maintenance • Optimizing track geometry for mixed traffic is a challenge • Curve super-elevation allows for higher speed passenger traffic but causes problems for lower speed freight traffic • Better performing trucks allow for higher cant deficiency operation. Tilting equipment allows passengers’ on-board safety and comfort to be preserved, while traveling at higher speed on under-balanced curves

  13. FRA Passenger Equipment Safety Standards • Tier I - For passenger equipment with amaximum operating speed less than 125 MPH • Conventional intercity and commuter equipment • Tier II – For equipment with maximum speedsof greater than 125 MPH but less than 150 MPH • Developed for Acela, adopted as FRA regulations • Additional strength requirements • Crash-energy management requirement • *Tier III – Will allow speeds of up to 220 MPH on dedicated line • Interoperable with other equipment below 125MPH • Some standards may be less stringent than Tier II because of restrictions on operating environment Drawings from: Siemens (in DiBrito et al 2011) * Regulation under development

  14. Shared Rail Corridors: PLANNING AND OPERATIONS

  15. Operational Interference and Incompatibility • Heterogeneous operating characteristics such as speed and especially priority, disproportionately consume rail line capacity and introduce delay • Dedicated tracks for each reduces this impact but increases cost • New passenger operation is likely to require additional rail capacity, such as: • Siding upgrades • Additional main track • Improved turnouts • Signal upgrades

  16. Adding Passenger Trains to a Freight Line The public sector invests in the freight railroad’s infrastructure to replace capacity lost to passenger trains Average Train Delay Number of Trains/Day

  17. RailTEC Simulation Modeling Software: Rail Traffic Controller • Developed by Eric Wilson from Berkeley Simulation Software • Emulates a dispatcher controlling train movements across a network based on train priority • Integrated train performance calculator • Inputs: track, signals, trains, and schedule • Output: delay, average velocity, on time performance Route information • Single track with 15 mi between siding centers • Double track with 15 mi between universal crossovers Both routes 260 mi long

  18. Delay Increases Due to Heterogeneity in Train Type 36 Trains Per Day Freight Train Delays Average Train Delay Delays Due To Heterogeneity Passenger Train Delays 100% Freight 100% Passenger 2012 MS thesis research by Sam Sogin

  19. Distribution of Delays 24 Freight Trains 24 Freight Trains + 8 Passenger Trains 32 Freight Trains 2012 MS thesis research by Sam Sogin

  20. Distribution of Freight Delays on Single & Double Track Double Track Single Track 28 Freight + 8 Passenger 40 Freight + 24 Passenger 2012 MS thesis research by Sam Sogin

  21. Industry Survey Rating Criteria Survey Participation • Criteria assessed on a scale from 1 (high) to 5 (low) • Potential to increase safety - incident severity, frequency • Potential to increase corridor effectiveness - tonnage, speed, ridership, reliability • Potential to reduce costs - initial costs, maintenance and operating costs, lifecycle costs • Research priority • Overall importance (2x) 24 total participants

  22. Top Rated Challenges Planning & Ops. Safety Infrastructure • Special trackwork • Ballasted track optimization • Track transitions • Traffic scheduling patterns • Maintenance of way scheduling • Capacity planning methodologies • Adjacent track derailments • Roadway worker safety • Highway grade crossings

  23. Questions? Acknowledgements Contact Information Christopher P.L. Barkan  Professor Director of Railroad Engineering Program George Krambles Faculty Fellow  UIUC<cbarkan> at illinois.edu  M. Rapik Saat  Research Assistant Professor UIUCE-Mail: <mohdsaat> at illinois.edu  Brennan M. Caughron Graduate Research Assistant UIUC E-Mail: <bcaughr2> at illinois.edu Samuel L. Sogin Graduate Research Assistant UIUC Brandon Van Dyk Graduate Research Assistant UIUC