40 likes | 118 Views
This progress report outlines the research updates on HI perturbation study for the period between summer and autumn 2013. It details the available and pending interactions and figures while noting the status of various system components. For more information, refer to the provided PPT file and related email communications.
E N D
HI, perturbation-Ipaper, summer-autumn, 2013: H(1), V(m+6), m(0), R(0) –system O(0), V(m+7), k(1) – system I(0), V(m+9)-system „…..PPT-130910ak.pptx“ (AK/C:, Dropbox 8..FromAgust /HI-perturb-I/..) And https://notendur.hi.is/~agust/rannsoknir/rempi/hi/July13/PPT-130910ak.pptx
H(1), V(m+6), m(0), R(0) –system O: NOT available a: available, seeppt/e-mail 5.09.13 from HRH, b: not possibletoobtain: seeppt/e-mail 5.09.13 from HRH c: not clear / can not bepublished, however, seeppt/e-mail 5.09.13 from HRH d: J-assignmentuncertain. e: available for H(1) – V(m+6) interaction, see (original )manuscript f: in progress; see HRH e-mail, 090913 g: not possibletoobtain h: available: Fig 1a
2) O(0), V(m+7), k(1) – system O: NOT availablea: available: Fig. 3a (former Fig. 3b) in manuscript b: available: Fig. 3b (Former Fig. 3a) in mnuscript c: In HI, Newstatespaper: addtosupplementalmaterial d: available for O(0)- V(m+7) interaction e: needstobedone f: available: Fig 4 (Former Fig. 3c) g: available, Figs. 5a,5b (Former Figs. 4a& 4b) h: available, Fig. 1b
3) I(0), V(m+9)-system O: NOT available a: needstobedoneb:available, Figs. 6a and 6b (former Figs 5a & 5b) d: availableh: In HI, Newstatespaper, figs 2d & 2e: addtosupplementalmaterial i: not appropriate!