WP04 SPS Fixed Water Based Firefighting System

This project involves the consolidation of a fixed water based firefighting system. The installation, commissioning, and dismantling of the old system will take approximately 10-14 weeks. Limited space and restricted access may impact other works. Access through shaft stairs might be limited during heavy piping works.

wpatricia
Download Presentation

WP04 SPS Fixed Water Based Firefighting System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP04 SPS Fixed Water Based Firefighting System Anna Suwalska BE-ICS-CSE EDMS 1814348

  2. EDMS 1814348

  3. WP04 Works EDMS 1814348 Type of work: Consolidation Location (per SPS point): • BA surface (next to the current sprinkler station) • SPS Shaft • TA Gallery, TA Passage, TA Storage Area (behind the lift) • LSS+, LSS-, Intersection Duration (per SPS point) • 10 - 14 weeks of installation • 2 weeks for commissioning • 2 - 4 weeks for dismantling of the old system (Shafts) • Start of works: Week 04, 2019 • Scheduled End: Week 30/2020 Impact on other works: • Heavy piping works (welding, lowering down pipes) – the access through the shaft stairs might be limited through a period of time. • Limited space for other works • Shafts - no scaffolding but the access through the shaft stairs might be limited • TA Passage, TA Storage Area, LSS, Intersection: Scaffolding (6.0 x 1.5 x 3.0 m) • TA Gallery – access might be difficult Other services (Plan. Activity 11195) • Power, Cabling from LSS, TA to BA surface (3 weeks before the installation Phse end) • Drainage (SMB) – 3 weeks before the installation Phase end • HSE-FB, HSE-SEE during Commissioning

  4. WP04 Planning EDMS 1814348