An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report aboutcontrollingactivity and itsresultsintheprogrammein2013TOP Monitoring Committee Meeting 21.11.2013.

  2. Mangement and ControlsystemCommonground: international standard

  3. European Commission October, 2012 – Horizontalpublicprocurement auditno 2012/HU/REGIO/J2/1161/1 regardingthe management and controlsystem of Hungary Observation: • Discriminatoryselectioncriteria – CompulsoryrequirementforregistrationwiththeHungarianChamber of Engineersatthe tender submissionstagefor TOP • EC has obligatedtheHungarianauthoritiestoeliminate and avoidthispracticeinthefuture, aswellastoimplement an amount of 5% correction of overhead.

  4. European Commission Base of thecorrection: Everyexpenseitemcontainedintheexpensecertificationsalreadysubmittedtothe EC and alsointhecontractssignedbefore 1stFebruary 2013 and exceededthe EU thresholds. The expenseitemswhicharetoverifyinthefuture and arecontainedinthecontractssignedbefore 1stFebruary 2013, exceededthe EU thresholds and submittedduringtheeligibilityperiod. Correction: Alltogether 296 contractingagreement / contract of servicesareconcerned, thetotalvalue is 1060,4 billion HUF (EU: 835,2 billion HUF, its 5% is 41,8 billion HUF)

  5. European Commission 23-27. September 2013. – Horizontalpublicprocurement audit no 2013/HU/REGIO/C2/1199/1 (TOP-SIOP) regardingthe management and controlsystem Subject of monitoring: 20 contractingagreement / contract of services Presently: data service phase

  6. Activity of DGAEF in 2013 The aim of thesystemcontrolof 2012 • Todeterminewhetherthechanges and theoperation of the management and controlsystem of TOP correspondwiththelaw and internalregulations, aswellastheelementsandtheprocedures of thesystemensurethelegitimate and properutilization of thesupport. • Tochecktherealization of thesuggestionsofthesystemcontrolsfromthepreviousyears. 24 test projectshas beenselectedinthe interest of testing theprocedures, controls and thecorrespondencetotherequirements and aims of thesystemcontrol.

  7. Activity of DGAEF in 2013 The result of thesystemcontrolof 2012 Inthe 4-grade systemusedfortheclassification of theOperationalProgrammesTOP has gotthe „level 2, itoperatesbutsomeamendmentsarereqiured” classification. The control has notrevealedanysevere, systemicerrorwhichwouldinfluencethecommunityfunding. The systemcontrol has notbeenspecifiedanyfinancialcorrectionsto be implemented. The DGAEF has specifiedthesettingup of irregularityprocedureconcerningthesystemcontrolonlyinonecase.

  8. Activity of DGAEF in 2013 Samplingproceduresin 2013 Basedonriskassessment, 22 projects has beenselectedforsamplingcontrol. • Submitting of 13 draftreports is inprogress, • Concering 8 out of 9 submitteddraftreports no irregularity has beenoccured, in 1 casethepaying of amount of 1890 HUF loss of interest payment has beenordered.

  9. Controls of externalauthorities – TOP 2013 State Audit Office of Hungary • Control of thedischargeof 2012 • Underlyingcontroltooffer an opiniononthebill of thebudgetof 2014 • Follow-upinspection of theinvestmentprocessof Metro line 4 HungarianStateTreasury • Regularity and targetedauditsonbehalf of NDA • Fact-findingmissions and investigations • Audit of authenticationreports

  10. Inspections of NDA’sInternal Audit –TOP 2013 The number of theinspectionscarried out byNDA’sInternal audit: 4 • Control of theimplementationofthetasksduringthemaintenanceperiod, • Control of theoperationofthemodified SLA system and thefollow-upcontrol of theannualreportof 2012, • Practice of thecontrolofthe market priceattheintermediatebodies and theinspection of itsmethodology, • The transparencyfollow-upcontrol of thebeneficiariesgainedsupportintheprogrammingperiodof 2007-2013 accoringtothe 50. § (1) c) point of CXCV. lawonstatebudget of 2011.

  11. On-the-spotverifications • By MA: level C • Periodically • Incase of selectedprojectsbasedonriskassessment • ByIB’sEngineeringDeperment: level B • Basedonannualplanning, each project is verifiedatleastonce a year (duringimplementation and maintenanceaswell) • Incase of selectedprojectsbasedonriskassessment • By a supervisingengineer, as an externalexpert: level A • Basedonannual and monthlyplanning, duringtheconstructionphaseweekly, planningandfeasibilitystudyarepreparedmonthlyadjustedtothecooperations. Duringthemaintenanceperiodatleastonce a year. • Incase of eachlive TOP projects

  12. TOP MA – verificationlevel „C” 1/2013. Director-GeneralInstruction of theon-the-spotverificationlevel „C” Goals: Tofollow-uptheadequateprogress of thesupportingcontractoftheinvestments , toensuretheregularityoftheuseofpublicfunds, tocorrectpromptlythedificienciesidentified. Numbers of theverifications: 36 on-siteverificationslevel „C” in 2013: - 13 roadprojects, - 21 railwayprojects - 2 projectsforthetransportreconstrucion of the Buda CastleDistrict Irregularityprocedures: 2 proceduresareinprogress, incase of 2 procedures no irregularity has occured.