An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome to theEBC Breakfast MeetingThe CSO Program UpdateFrederick A. LaskeyExecutive DirectorMassachusetts Water Resources Authority

  2. Presentation to theEnvironmental Business Councilof New EnglandCSO Program Update Frederick A. LaskeyExecutive Director May 18, 2006

  3. On April 27, 2006, Judge Stearns the Long-Term CSO Plan “With this agreement in place, we are taking a giant step towards . . . a model of environmental remediation.” - U.S. District Court Judge Richard G. Stearns

  4. The CSO Problem: 1985 • 84 combined sewer overflows • Thousands of discharges per year • Over 3 billion gallons of untreated discharges

  5. CSO Control Plan - Progress to Date • 23 of 29 projects completed or in construction • 21 CSO outfalls closed • Dry weather overflows eliminated • Constitution Beach and Neponset River CSOs eliminated • Annual CSO volume reduced by 2.5 billion gallons (76% reduction) • More than 60% of remaining overflows receive treatment • $340 million spent to date • Dramatic improvement in receiving water quality

  6. 1987 - 1991 1999 - 2005 Dramatic Improvements In Bacterial Water Quality:Wet Weather 1999 - 2005 (After Secondary Treatment and New Outfall) 1987-1998 (Before Secondary Treatment and South System transfer) Average Enterococcus counts in Boston Harbor in wet weather The lighter the blue, the better

  7. Deer Island Pumping Capacity Has Doubled Since 1985

  8. MWRA’s CSO Projects

  9. 23 Projects Have Been Completed Or Are In Construction

  10. 7 CSO Projects Still To Come • Three projects are in design: • North Dorchester Bay Storage Tunnel • Reserved Channel Sewer Separation • Morrissey Boulevard Storm Drain • New projects: • Bulfinch Triangle Sewer Separation • Brookline Sewer Separation • Cottage Farm Inflow Controls • Interceptor Gate Controls

  11. CSO BOS019 Storage Conduit, Charlestown

  12. Stony Brook Sewer Separation

  13. Stony Brook Sewer Separation

  14. South Dorchester Bay Sewer Separation

  15. South Dorchester Bay Sewer Separation

  16. CSO Facilities • Commercial Point • Fox Point

  17. Union Park CSO Facility

  18. Fort Point Channel Sewer Separation

  19. East Boston Branch Sewer Relief

  20. Alewife Brook CSO Control:CAM002-004 Sewer Separation

  21. Pleasure Bay Storm Drain Improvements

  22. 17-foot, soft ground storage tunnel with pump-out at Conley Terminal Virtual elimination of CSOs to North Dorchester Bay North Dorchester Bay/Reserved Channel:17-Foot Soft Ground Tunnel 079 080 BMD to DITP 076 078 081 Columbus Park Headworks 082 084 085 083 086 087

  23. Dewatering pump station at Conley Terminal Odor control facility at State Police Building North Dorchester Bay/Reserved Channel:Dewatering and Odor Control 079 080 BMD to DITP 10-mgd Pump Station 076 078 081 Columbus Park Headworks 082 084 085 083 086 087 Odor Control Facility

  24. In storms larger than a one-year storm BOS087 stormwater redirected to enlarged Morrissey Blvd. storm drain and discharged to South Dorchester Bay 5-year level of stormwater control for North Dorchester Bay North Dorchester Bay/Reserved Channel:Enlarged Morrissey Boulevard Storm Drain 079 080 BMD to DITP 10-mgd Pump Station 076 078 081 Columbus Park Headworks Stormwater Gates 082 084 085 083 086 087 Odor Control Facility Enlarged Storm Drain

  25. Separate ~ 355-acre area between Reserved Channel and East 4th Street Reduce frequency of CSO discharges from 37 to 3 in a typical year Reduce CSO discharge volume from 41 mg to 1.4 mg in a typical year North Dorchester Bay/Reserved Channel:Reserved Channel Sewer Separation 079 080 BMD to DITP 10-mgd Pump Station 076 078 081 Columbus Park Headworks Stormwater Gates 082 084 085 083 086 087 Odor Control Facility Enlarged Storm Drain

  26. Reductions in Overflows at South Boston Beaches in a Typical Year

  27. Charles River: A National Model For CSO Control • The MWRA has already achieved significant reduction of CSO related impacts to the Charles River: • Sewer separation and hydraulic relief projects have dramatically reduced combined sewer overflows • Much more flow is sent to MWRA’s new Deer Island Treatment Plant • Upgrades to Cottage Farm and Prison Point facilities have improved disinfection

  28. Charles River Report Card: B+ for 2005

  29. Charles River: System Optimization

  30. Charles River: Bullfinch Triangle Sewer Separation

  31. Charles River: Brookline Sewer Separation

  32. Reductions in Overflows From Cottage Farm in a Typical Year

  33. Reductions in Overflows to Charles River

  34. $700 Actual Projected Boston Harbor Project $600 Drinking Water MetroWest Tunnel Other Waterworks Wastewater Interception & Quality Improvements Pumping, and Facilities $500 Improvements Waterworks Distribution & Pumping $400 Combined Sewer Overflows Millions $300 Business and Operations Support $200 $100 $0 FY86 FY88 FY90 FY92 FY94 FY96 FY98 FY00 FY02 FY04 FY06 FY08 FY10 FY12 FY14 FY16 MWRA’s Capital Improvement Program1986 - 2016

  35. 3.5 3 2.5 Billions of Gallons 2 1.5 1 0.5 0 1988 1992 2002 2015 Untreated Treated Annual CSO Volume Has Been Reduced Dramatically • Annual CSO volumes have already been reduced by 2.5 billion gallons • By 2015, 95% of the remaining CSO flows will be treated

  36. On April 27, 2006, Judge Stearns the Long-Term CSO Plan “I believe that this is one of the most successful modern public works projects ever undertaken.” - U.S. District Court Judge Richard G. Stearns

  37. Thank you for Attending EBC Breakfast MeetingThanks to our Sponsors