1 / 10

1. Mission Objectives

1. Mission Objectives. Survive launch into space Obtain a 525 km orbit, 27 degree inclination Successfully deploy boom Telescope for X-Ray imaging Locate black holes, collapsed stars Measure distribution of material in remnant of stars Control attitude and orbit Point accurately at stars

viet
Download Presentation

1. Mission Objectives

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1. Mission Objectives • Survive launch into space • Obtain a 525 km orbit, 27 degree inclination • Successfully deploy boom • Telescope for X-Ray imaging • Locate black holes, collapsed stars • Measure distribution of material in remnant of stars • Control attitude and orbit • Point accurately at stars • Collect and transmit data back to earth • Store a certain amount of image data • Transmit at a certain rate during daily downlink • Lifetime of 24 months 1

  2. 2. Instrument Requirements • Sensitivity <2 x 10-14 erg/cm2/s (10-30 keV) <6 x 10-14 erg/cm2/s (60-75 keV) Obs. Time: 106 seconds, photon spectral index =1.7, 3 • Bandpass 10-75 keV • Spectral resolution <1.5 keV FWHM (@68 keV) • Angular resolution (HPD) <60 arcsec • Source positioning accuracy <10 arcsec 3 per axis • Field of view >8’ 2

  3. 3. Requirements Structural • Characterize thermal/structural properties of boom • Boom deflection must be within X amount • Boom deployment reliable to certain accuracy • Temperature must be kept within certain range Dynamics • Characterize dynamic responses of boom • Pointed 1 arcsec for 1 hour at operating conditions Metrology • System design accurately measure optic placement • Accurately measure detector placement w.r.t. optic 3

  4. 4. Requirements for Each Team Structural • Characterize 0-G and 1-G behavior • FEM model of structure • FD/FEM model of thermal • Mass properties • Error budget Dynamics • Dynamical model • Environmental disturbances (external, internal) • Dynamical responses (frequency) • Sensitivity studies • Error budget Metrology • Choose measurement system • Laser v.s. particle velocimetry • Error budget 4

  5. Structural TeamElah Bozorg-Grayeli Francisco Chacon Vahe Gabuchian Ajay HarishAlireza Karim Zac Lizer Elliott PallettMatthew Wierman 5

  6. Receivables and Deliverables • Receivables from other teams • Dynamics Team: Vibration sources for modal analysis. • Metrology Team: Accuracies necessary for equipment. Can we rotate for thermal management • Receivables from JPL • Mission conditions • Pointing conditions • Launch requirements • Deploying procedure • Deliverables • Dynamics • FEM Model: Modal analysis results (mass, stiffness, damping) • Mass properties • Metrology • FEM Model: Modal analysis results (stability) • Error Budget • Thermal • Deflections • 0-g and 1-g FEM Model 6

  7. Team Objectives and Steps Outlined • TEAM OBJECTIVES • Characterize 0 and 1-g behavior of S/C • FEM of structure • FD/FEM of structure • Mass properties • Error budget and sensitivity studies • Integrate structural and thermal models of system • STEPS OUTLINED • Build FEM model from configuration • Run FEM model for 0-g body force and 1-g body force conditions • Compare 1-g data with experimental data • Integrate FEM and thermal model • Modal analysis • Determine thermal loads on system • Conduct material analysis of structure • Determine possible configuration changes 7

  8. Dynamics TeamPrakhar MehrotraInki ChoiKevin WattsAjay HarishDerek ChanSilas Hilliard 8

  9. Receivables and Deliverables • Receivables from other teams • Structural Team: M, K, C for dynamics model • Metrology Team: Accuracies & tolerances; Sensor inputs that relates to observability • Receivables from JPL • Decide how to model disturbance forces • Internal (Reaction wheels) • External (Solar pressure, Drag etc) • More details on S/C configuration • Reaction wheel, Torqrod configuration and specs • Mass model comes from Structure team • Deliverables • Complete dynamic model and modal analysis • Orbital information and effect of disturbance forces • Dynamic responses in time/frequency domain • Controllability and observability of S/C • Sensitivity studies and error budget • Develop framework for determining optimal control 9

  10. Team Objectives and Steps Outlined • TEAM OBJECTIVES • Dynamic modeling (before PDR) • Orbital dynamics (before PDR) • Altitude control (after PDR) • Stability of spacecraft about each axis – x, y and z • Error budget and sensitivity studies • Create framework to design optimal control system • STEPS OUTLINED • Obtain dynamic model • Determine orbital motion • Point mass  Rigid body  Flexible body • Determine attitude dynamics, controllability and observability • Dynamic analysis in time/frequency domain • Control system plan • System block diagrams 10

More Related