val
Uploaded by
11 SLIDES
277 VIEWS
110LIKES

Team 4

DESCRIPTION

Team 4. Submitted By: Mayed AbuMuhair Jake Bramande Chang Song Abhilash Chukkapalli Submitted to: Xinli Wu. Introduction. Design project 2: Xerox igen4 Paper Velocity measurement device Why is it Important? Utilization of our design solution. . Gantt Chart. Our Idea. Brainstorming

1 / 11

Download Presentation

Team 4

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team 4 Submitted By: MayedAbuMuhair Jake Bramande Chang Song AbhilashChukkapalli Submitted to: Xinli Wu

  2. Introduction • Design project 2: Xerox igen4 • Paper Velocity measurement device • Why is it Important? • Utilization of our design solution.

  3. Gantt Chart

  4. Our Idea • Brainstorming • Many possible solutions • 5 different ideas • Concept generation • Scanning laser solution. • Ultrasound or supersonic solution • Induction Coils.

  5. Selection Matrices

  6. Selection Matrices Cont… • We decided to develop concept “B”

  7. Our Solution!

  8. How it works • 6 different laser detectors read the precise time when the paper passes underneath. • Advantages of using 6 lasers. • Using the simple formula: • Velocity = Distance/Time • This design calculates the speed up to 15 times! • This makes our design extremely accurate and reliable.

  9. Advantages of Our Design • Simple • Generic formula • Reliable • Can still compute velocity even if one laser fails • Very Accurate • Computes the average speed at different locations • Easy instillation • Reasonably compact • Few Components.

  10. Design Features • Design features • 1- Simple to install • 2- Easy to replace parts. • 3- Low power usage • 4- Safe to operate • 5- Very high accuracy • 6- Measures velocity up to 15 times! • 7- Can order packages with 2, 4, or 6 lasers.

  11. Conclusion • Thank you for kindly not falling asleep during the duration of our presentation • Good Luck on your Finals and have a great winter break!

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer