An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DI&C Project & Lead-Plant Experiences Gordon Clefton March 11, 2009

  2. Digital Experiences --- Agenda • Why Digital Upgrades • Digital Operating Experience at Oconee • Lessons Learned with Oconee’s LAR • Digital Project Path Forward

  3. Why Digital Upgrades(1 of 1) • Driving Forces for Digital Upgrades • Existing plant systems are obsolete • Spare parts are limited • Component repairs are addressing near-term equipment issues • Elimination of single failure vulnerabilities through redundant equipment • Enhancements to system design and functions • Significantly improved on-line monitoring and channel check capability

  4. Digital Operating Experience at Oconee (1 of 2) • Digital Upgrades completed on Oconee Units: • Integrated Control System (1996-1998) • Operator Aid Computer (1998-1999) • Main Turbine Control System (2002-2004) • Digital Control Rod Drive Control System • Turbine Supervisory Instrumentation • Foundation Fieldbus System for Instrument Loop Upgrades (Process Control System) • Electrical Generator Automatic Voltage Regulator

  5. Digital Operating Experience at Oconee (2 of 2) • Positive OE from Digital Upgrades: • Replaced obsolete systems which had performance problems • Improved system and plant reliability by installing redundancy to eliminate single point vulnerabilities • Improved reactivity management by increasing system stability and reducing operator burden during power maneuvers • Significantly improved: • System monitoring • Online functional check capabilities • Improved diagnostic capabilities

  6. Lessons Learned with Oconee’s LAR(1 of 1) • For digital upgrades requiring NRC approval (RPS & ESPS), lessons learned by Oconee: • Regulatory findings • Regulatory standards • High quality, accurate, and timely documents • Milestone schedule • Communications • NRC/Vendor/Utility Engineering strength

  7. Digital Project Path Forward(1 of 1) • Interim Staff Guidance (ISG): • Revise DI&C-ISG-02, ISG-04, & ISG-05 • Create DI&C-ISG-06 & ISG-07 • Roll ISG content into permanent guidance • Digital Project Workshops • Lessons Learned (Oconee & Wolf Creek) • LAR Preparation using ISGs

  8. DI&C Project & Lead-Plant Experiences • Questions ? • Items to carry to NEI ?