Download
100 percent improvement in capital productivity n.
Skip this Video
Loading SlideShow in 5 Seconds..
100 Percent Improvement in Capital Productivity PowerPoint Presentation
Download Presentation
100 Percent Improvement in Capital Productivity

100 Percent Improvement in Capital Productivity

0 Views Download Presentation
Download Presentation

100 Percent Improvement in Capital Productivity

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. 100 Percent Improvement in Capital Productivity Bill Bolton DuPont and Day & Zimmermann Case Study

  2. 100% ImprovementinCapital Productivity

  3. Business Goal1997-Present • Cut capital investment/lb. in half. • Maintain competitive advantage.

  4. StrategyHow Do We Get There? Decided we needed to: • Become functionally excellent in project execution. • Be one with the business. • Integrated engineering into the business: • Achieved better front-end loading definition. • Reduced redundancy. • Engineering stays current with business conditions and drivers.

  5. Align with Contractor • Integrated contractor into engineering • Developed core competencies. • Eliminated redundancies. • Leveraged resources. • Shared systems. • Built stronger relationships inclusive decision making.

  6. Global Standardization Enabled us to standardize: • Engineering and design • Developing standard packages • Global package champions • Equipment specs • Design packages (bid documents) • Construction strategy • Operating procedures • Maintenance procedures • Environmental issues • People management issues

  7. Centralize Technology • Maintain quality in technology. • Have consistency in technology. • Have consistent end product. • Project technologist centrally located. • Manage change.

  8. Maintaining Global Competitiveness • Replication (PDMS) • More competitive equipment bidding • Global procurement (qualifying suppliers) • Developing better construction bid package • Negotiate better lump sum competitive bids • Benchmark against global competitors • Continual step change improvements

  9. Capital Productivity Improvement 0 X1 X2 and X3 Good % Investment Cost/Lb. X4 X5 X6 100 1997 1998 1999 2000 2001

  10. Implementation Session Panelists Bill Bolton DuPont Randy Swartz Day & Zimmermann International

  11. Implementation Session Salons 10-12 2:20 pm - 3:20 pm and 3:30 pm - 4:30 pm