1 / 59

Arizona Corporation Commission Industry and Public Workshop Integrated Resource Plan Assessment

Arizona Corporation Commission Industry and Public Workshop Integrated Resource Plan Assessment. October 25, 2012 Global Energy & Water Consulting, LLC Evans Power Consulting, Inc. Arizona Corporation Commission Industry and Public Workshop Integrated Resource Plan Assessment October 25, 2012.

trella
Download Presentation

Arizona Corporation Commission Industry and Public Workshop Integrated Resource Plan Assessment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Arizona Corporation CommissionIndustry and Public WorkshopIntegrated Resource Plan Assessment October 25, 2012 Global Energy & Water Consulting, LLC Evans Power Consulting, Inc.

  2. Arizona Corporation CommissionIndustry and Public WorkshopIntegrated Resource Plan Assessment October 25, 2012 • Purpose • To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of: • APS – Arizona Public Service Company • TEP – Tucson Electric Power Company • UNS – UNS Electric, Inc. • AEPCo – Arizona Electric Power Cooperative, Inc. • As required by the Commission’s IRP Rules • To solicit input from all stakeholders

  3. Integrated Resource Planning • The purpose of Integrated Resource Planning (IRP) • To develop a long-term plan to meet customers’ electric needs taking into consideration: • Input of all stakeholders • All Relevant Costs • Reliability of service • Environmental and societal impacts • Demand Reduction and Increased Supply on an equal basis

  4. Arizona IRP Requirements • Each IRP must be reasonable and in the public interest , considering the following factors: • The total cost of electric energy services; • The degree to which the factors that affect demand, including demand management, have been taken into account; • The degree to which supply alternatives, such as self-generation, have been taken into account; • Uncertainty in demand and supply analyses, forecasts, and plans, and whether plans are sufficiently flexible to enable the entity to respond to unforeseen changes in demand and supply factors; • The reliability of power supplied, including fuel diversity and non-cost considerations; • The reliability of the transmission grid; • The environmental impacts of resource choices and alternatives; • The degree to which the entity considered all relevant resources, risks, and uncertainties; • The degree to which the entity’s plan for future resources is in the best interest of its customers; • The best combination of expected costs and associated risks for the entity and its customers; and • The degree to which the entity’s resource plan allows for coordinated efforts with other entities.

  5. Arizona IRP Requirements • Renewable Energy Requirement: • 3.5% of retail energy sold in 2012 • Increasing to 15% by 2025 • Distributed Renewable Energy Requirement: • 30% of the Annual Renewable Energy Requirement • Energy Efficiency Standard: • 3.0% of retail energy sold in 2012 • Increasing to 22% by 2020

  6. Integrated Resource Planning

  7. The Basic IRP Process Load Forecast Sensitivity & Risk Analyses A plan: Best Mix of Demand and Supply-Side Resources to add in the future Existing Resources Integration Process Demand-Side Options The IRP Supply-Side Options Assumptions

  8. APS – Existing Resources8,840 megawatts

  9. APS Peak Demand Load Forecast 3% Average Annual Growth

  10. TEP – Existing Resources2,859 megawatts

  11. TEP Peak Demand Load Forecast 2.3% Average Annual Growth

  12. UNS – Existing Resources526 megawatts

  13. UNS Peak Demand Load Forecast 1.0% Average Annual Growth

  14. AEPCo Existing Resources645 megawatts

  15. AEPCo Peak Demand Load ForecastArizona All Requirements Members Only Loss of customers to City of Safford 1.2% Average Annual Growth

  16. SRP Existing Resources7,866 megawatts

  17. SRP Peak Demand Forecast 2.9% Average Annual Growth

  18. All Peak Demand Load Forecasts

  19. Energy Efficiency Options Considered

  20. Demand Response Programs Considered

  21. Supply-Side Options Considered

  22. Distributed Generation Considered

  23. Assumptions

  24. Natural Gas Prices

  25. CO2 Emissions Costs

  26. Retirements • APS • Four Corners Coal Plant • Retire Units 1-3, purchase SCE shares of Units 4 & 5 • Net Gain of 179 MW • Long-term Purchases • UNS • Long-term Purchases • No other fossil retirements

  27. APS – Plans Considered • Base Case • Retire Four Corners 1-3, purchase SCE share of 4&5 • New gas-fired generation • EE & RES Compliance • Four Corners Contingency • Retire all Four Corners units • Replace with gas-fired generation • Enhanced Renewable • Base Case Four Corners • 30% additional energy needs met with RE • Coal Retirement • Retire all coal-fired generation • Replace with gas-fired generation and RE

  28. APS – Sensitivities • Natural Gas Prices – High & Low • CO2 Prices – High & Low • Renewable Tax Credits Extended • EE Costs – High & Low • Externalities

  29. TEP – Plans Considered • Reference Case • No coal retirements • New gas-fired generation • EE and RES Compliance • Four Corners Retirement • Navajo Retirement • San Juan Retirement • Springerville Replacement • Externalities

  30. TEP - Sensitivities • Natural Gas Prices – High & Low • Wholesale Market Prices – High & Low • Load Growth – High & Low

  31. UNS – Plans Considered • Reference Case • New gas-fired peaking units • RES Compliance • Combined Cycle Case • Joint ownership of combined-cycle unit • RES Compliance • Externalities

  32. UNS - Sensitivities • Natural Gas Prices – High & Low • Wholesale Market Prices – High & Low

  33. AEPCo – Plans Considered • Base Plan • Short-Term Purchases SRP – Plans Considered • Information not supplied

  34. Firm Wholesale Sales End

  35. Long-term Purchases End

  36. SRP Additions • SRP Fiscal Year 2011 Resource Plan • EE programs at 3-4% of retail requirements • DR programs - 100 mw • Interruptible programs - 100 mw • TOU programs - 100-200 mw • Renewable generation - 450 mw • Purchased power – 500 mw • Natural gas generation – 1360 mw

  37. Capacity Mix ChangeAPS, TEP, UNS and AEPCo

  38. Energy Mix ChangeAPS, TEP, UNS and AEPCo

  39. CO2 Emissions - Combined

  40. NOX Emissions - Combined