An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SE 12th Street Roadway Improvements February 8, 2005

  2. N PROJECT LOCATION E. UNIVERSITY AVENUE 26 331 SE 12th STREET SE 1st AVENUE SE 11th STREET SE 2nd AVENUE

  3. PROJECT PURPOSE • Widen roadway and improve condition of pavement • Improve pedestrian access, movement and safety • Address residential flooding problems • Improve water quality of Rosewood Branch

  4. DESIGN ELEMENTS • Reconstruction/widening of SE 12th Street • Addition of curb & gutter and storm drain system • Sidewalk and ADA-compliant ramps • Paved driveway entrances • Parking reconfiguration in commercial area • Construction of stormwater pond • Rosewood Branch stream bank stabilization

  5. N PROPOSED IMPROVEMENTS E. UNIVERSITY AVENUE 26 • Roadway widened from 20’ to 24’ • Curb & gutter and storm drain system • Paved driveway entrances at all existing • locations • 6’ sidewalk along west side of • roadway for entire street length • 8’ sidewalk and parallel parking along east • side of street in front of commercial area • Utility relocations • Stormwater management (SWM) pond • south of SE 2nd Avenue for water quality • Grade and stabilize stream banks south of • SE 2nd Avenue 8’ SIDEWALK PARKING SE 1st AVENUE SE 12th STREET 6’ SIDEWALK SE 2nd AVENUE STREAM WORK SWM POND

  6. ROADWAY TYPICAL SECTION Existing Roadway Proposed Typical Section

  7. SE 12th STREET - Looking Towards SE 2ND Avenue Existing Conditions Artist’s Rendering

  8. SE 2nd AVENUE AT SE 12TH STREET (Looking East) Existing Conditions Artist’s Rendering

  9. SE 12th STREET AT SE 2nd AVENUE (Looking North) Existing Conditions Artist’s Rendering

  10. SE 12th STREET - Looking At East University Avenue Existing Conditions Artist’s Rendering

  11. ROSEWOOD BRANCH STREAM WORK • New endwall • Stabilize stream banks • Lay back slopes • Revegetation • Erosion Protection • Reforestation

  12. CONSTRUCTION GOALS • Minimize disruptions to residents and businesses • Keep all impacts within City right-of-way • Grading for sidewalk • Driveway entrance tie-ins • Maintain one lane of traffic at all times during construction • Road to be closed to through traffic • Access for local residents only • Maintain access to all residential/commercial driveways/entrances • Complete construction as quickly as possible

  13. PROJECT SCHEDULE We Are Here