Good Catch

Chalmette Refinery. Good Catch. 04-12-05. ICAR. Date & Time Incident Started: 4/11/05 12:10:00 PM

thu
Download Presentation

Good Catch

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chalmette Refinery Good Catch 04-12-05

  2. ICAR Date & Time Incident Started: 4/11/05 12:10:00 PM Incident Description: During inspection of K-2308 H2 make up compressor it was discovered that a bolt resting on the 4th stage suction piping had worn a hole in the pipe and caused the release of make up hydrogen. The compressor was taken off line the depressured.

  3. 1/4” stainless steel screw and nut. Designed for strength and corrosion resistance

  4. Side view of schedule 160 pipe. Designed to withstand high pressure

  5. The screw and nut mounted a temp gauge to a stainless steel plate.

  6. Back of plate was not obvious from the walk way. So, it was not visible to operators making their rounds The gauge was mounted at this height. Higher than this photo depicts. Gauge

  7. The screw and nut were touching the pipe at this height Gauge The screw and nut

  8. It appears that the inner wall of the sch. 160 pipe may have just been penetrated and began leaking Hydrogen because of the rubbing action of the screw and nut

  9. The nut actually fit inside of the hole

  10. Mounting bracket Wall of pipe Nut & washer Screw Point of contact

  11. Close up of screw and nut that cut through the pipe

  12. Bracket hanging from thermo coupling wire Section of pipe removed for repair.

  13. Section of pipe removed for repair. Location of hole

  14. Two mechanics from Dressor Rand happened to hear the leak when they were working the compressor and contacted our operators. The operators responded immediately and safely shut the compressor down

  15. Gerald Labarrere, stillperson of the HC unit, thanks Ronald Ratcliff and Mark Majorie, of Dressor Rand, for catching and reporting the leak

  16. On behalf of the JH&SC, Mike Fandal, ExxonMobil execution supervisor, presents Mark and Ronald Ratcliff, with a Safety award

  17. It’s hard to believe that a 1/4” screw......

  18. in just the right position, could cause such a potential situation.

  19. Release Potential ? Hydrogen

  20. Is there any equipment in your area that might be vibrating and touching other equipment? R.Evans JH&SC