An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CAA Taiwan PBN Statement 27 July 2009 Tiger Chao 趙培虎 Air Traffic Services Division

  2. Contents 01 RNAV Status in Taipei FIR 02 04 PBN Benefits CAA draft PBN Plan 03 ICAO APAC PBN Plan

  3. RNAV Status in Taipei FIR M750(M20) RNAV Route - 1997 N892 RNAV Route - 2001 20 GNSS approaches for 9 airports, RNAV SIDs & STARs for RCTP - 2001 T1(Flora) RNAV Transition Route - 2005 L1,J1 RNAV Transition Route - 2007 Cross-Strait Routes – 2008,2009

  4. RNAV/PBN Benefits Parallel Routes Shorter Routes Continuous Descent Approaches Efficient Use of Airspace Concentrated Tracks Reduce Environmental Impact

  5. ICAO Asia and Pacific Office (APAC) published the PBN IMPLEMENTATION PLAN (interim edition) in Sep 2008 CAA will follow ASIA/PACIFIC PBN IMPLEMENTATION PLAN

  6. PBN needs cooperation between Flight Standard Air Traffic Air Lines

  7. APAC PBN PLAN

  8. CAA Draft PBN Plan Short Term Long Term Mid Term M750→RNAV5 N892→RNAV10 →RNAV 1 (RCTP, RCKH & RCSS) RNAV(GNSS)→ Baro VNAV (RCTP, RCKH & RCSS) Re-organize all routes to RNAV5/ RNAV2 →RNAV1/ RNP1 (All airports) RNAV(GNSS)→ Baro VNAV (All ADs) RNP AR approach (selected AD) Seam-less Inter-operable →RNP1 (High density ADs) Baro VNAV (All ADs) RNP AR approach (selected AD) Route SID/STAR Approach

  9. THANKS!