1 / 7

12.20 report

12.20 report. LIU Qian. We found a noise on the -6V of pre-amp. We don ’ t know where it comes from. 50 ms/div. DC1M 2.00 V/div. So we used another low voltage, and measured pkpk after pre-amp. 10,000 events. Fit with the histogram with Gaussian, we got: 1.279 ± 0.030 V. reflection.

taylor
Download Presentation

12.20 report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 12.20 report LIU Qian

  2. We found a noise on the -6V of pre-amp. We don’t know where it comes from. 50 ms/div DC1M 2.00 V/div

  3. So we used another low voltage, and measured pkpk after pre-amp. 10,000 events. Fit with the histogram with Gaussian, we got: 1.279 ± 0.030 V. reflection 20 ns/div

  4. Then read Ref PMT from USTC module 0.03 pC/channel 690.7 ± 13.3 (1.9%) 718.9 ± 17.3 (2.4%)

  5. After that, we used the USTC module to measure the laser signal. The IHEP DAQ program still doesn’t finish. So we have to use the USTC program to acquire the data. (but USTC program has some bugs, and can only read 88 TOF data). We set all HV as 1050V, closed the west shuttle. Then we analysis the T(sub) = T(tof) – T(ref), and fit with Gaussian. Technically, only the west TOF end can have the signal because we only pulsed the east side laser, the east TOF end can only have some reflection laser. But we found that some east TOF does have signal, and west TOF doesn’t have signal. We’re still looking for the reason. Maybe the HV is not enough.

  6. The mean and sigma of west end TOF T(sub) We’re looking for the reason.

  7. Conclusion • At least, everything is working now. • I do really want to check all fibers are OK first, but I think the DAQ won’t be ready. Maybe I should check them one by one by the oscilloscope. • We installed west 17 bundles to the distribution boxes today. There are only 7 bundles left now. LIU Qian

More Related