320 likes | 444 Views
Possession in North Saami : Rich Morphology in Competition with an Analytic Construction. Laura A. Janda Lene Antonsen. WALS Feature 57a: Possessive affixes. North Saami. An ongoing language change : NPx is being replaced by Refl.
E N D
Possession in North Saami: Rich Morphology in Competition with an Analytic Construction Laura A. Janda Lene Antonsen
WALS Feature 57a: Possessive affixes North Saami
An ongoinglanguagechange:NPx is beingreplaced by Refl These two examples were found only a few pages apart in KirstiPaltto’s novel Ája NPx(possessive suffix with HIGH morphological complexity): Sonmanailatnjasis.3s.nomgo.ind.pret.3sroom.ill.sg.px.3s ‘He went into his room and lay down on the bed.’ Refl(analytic construction with reflexive genitive pronoun): son... gavccuiloktiiiežaslatnjii... 3s.nomclimb.ind.pret.3supstairs.ill.sgrefl.gen.3s room.ill.sg‘she.. climbed upstairs intoher room...’
Research questions • Is languagechangealwaysmotivated by socialvaluealone, or canthere be inherent fitnessvalues? Cf. Blythe & Croft (2012) “S-curves and themechanismsofpropagation in languagechange” • Is morphologicalcomplexitydisadvantaged in a contextoflanguagecontact? • Whathappens to theresidueof a languagechange? • Whatkindsofthingsarereallyinalienable?
Overview • The S-curve in our data • Inherent syntacticfitness • Inherent semanticfitness • Morphologicalcomplexity in the face of intense contact • A newvocative? • Conclusions
1. The S-curve in our Data • Literarytexts: 0.53M words, three age groups, twogeographic regions • 2272 examples, full analysis by hand • The New Testament (1998): 136 522 words • 1530examples, full analysis by hand • Newspapers: 10M words from threenewspapers (1997-2011) • 29964examples of words with frequency ≥5, partialautomaticanalysis, a lot ofcleaning by hand • Total: 33633 examples
See examplesillustrating Reference, Possessum Case, and Possessor Case onthehandout Tagging OnlyAnaphoric and Endophoricare used in statisticalanalysis • Construction (PossCon): NPx, Refl • Reference: Anaphoric, Endophoric, Exophoric, Generic • Possessum (the one that is possessed; PM): • Case: Nom, Acc, Gen, Ill, Com, Loc, Ess • Number: Sg, Pl • Semantic class: Kin, Human, Body... • Possessor (the one that possesses; PR): • Case: Nom/Verb, Acc, Gen, Ill, Loc • Person and number: 1Sg, 2Sg, 3Sg, 1Du, 2Du, 3Du, 1Pl, 2Pl, 3Pl • Semantic class: Human, Animal, Nature... • Source, Generation (Old vs. Mid vs. Young), Geography (East vs. West)
The S-curve:longitudinal data from literarytexts, showingonlyanaphoric and endophoricuse
No evidencethathighfrequencyhelps to retainNPxNews data: Pearson'scorrelation = -0.14, p = 0.0001, 95% confidenceinterval: -0.2 -0.07
CART-analysis “Classification and regressiontrees and Random forests”: • Optimal sortingof data • Resultssimilar to regression, butappropriate for non-parametric data • Bootstrapping and measurementof variable importance
CART-analysis for Literarytexts + NT(Anaphoric + Endophoric data only) PossCon ~ PMCase + PMClass + PRCase + Author
Variable importance for Literarytexts + NT PossCon ~ Generation + PMClass + PRCase + PMCase + Geography
CART analysis for News PossCon ~ PMCase + PMClass + PRPersNum
Whatthisanalysistellsus • We have an ongoinglanguagechangefollowing an S-curve • The most importantfactorsare: • Case ofpossessum and possessor >> syntacticfitness • Semanticclassofpossessum >> semanticfitness
2. Inherent syntacticfitness • Case ofpossessum • Case ofpossessor • For case-markingofpossessum and possessor, weseethatReflpredominates in non-prototypicaluses • Replaceability • NPx is alwaysreplaceable, Refl is not Refl has greater inherent syntacticfitness
PossessumCase (Literarytexts + NT data) Refl NPx Acc Gen Loc Ill Com Nom Ess
Possessum Case • Prototypical case for possessum is Accusative • ∼40% of all usesofbothNPx and Refl have Accusative • BothNPx and Reflarerobustlyattested for Genitive, Locative, Illative, and Comitative • Nominative and Essiveareleastprototypical for possessum • Here Refl has a strongadvantage • Refl is robust in all uses, and especiallystrong in non-prototypicaluses
Possessor Case • Prototypical case for possessor is Nominative/subject-agreement on the finite verb (“Nom/Verb”) • 96% of all NPx and 82% of all Refl uses are Nom/Verb • Refl has strongadvantage in non-prototypicaluses, particularlyLocative and Genitive • Refl is robust in all uses, and especiallystrong in non-prototypicaluses
Replaceability • NPxcan always be replaced by either Refl or null marking of possession or a Genitive pronoun • NPx can be replaced by Refl in exx. (1-12) • NPx can also be replaced by Genitive pronoun or Ø, as in: Máhttájeaddjiii leat stuorit go oahpaheaddjis[OriginalwithNPx] “The disciple is not greater than his teacher” Máhttájeaddjiii leat stuorit go suoahpaheaddji[Genitivepronoun] Máhttájeaddjiii leat stuorit go oahpaheaddji[Ø] • But the converse is not true for Refl, which cannot always be replaced: Muhtodienádjagislea iežassuollemasvuohta. (KP2: 107) “But that spring has its secret.” *Muhtodienádjagislea suollemasvuohtas.
Summary for Syntactic Fitness • Refl is well-representedacross full syntacticspectrum • Refl is predominant in peripheraluses • NPx is alwaysreplaceable • Refl is sometimesirreplaceable • RecallalsothatReflpredominates in Generic Reference (a type ofimpersonalconstruction)
3. Inherent semanticfitness Distribution acrosssemanticclasses for possessum • NPxfocuseson “corepossession” ofKin, Body, and Property • This focusgrowstighter over time • Refl shows more evendistributionacrosssemanticclasses
Distribution ofNPx vs. Reflacross semanticclasses Old NT Mid Young News
4. Morphologicalcomplexity in the face of intense contact • NPx is much more morphologicallycomplexthanRefl • North Saami is under intense pressurefrom bothGermanic (Norwegian and Swedish) and Finnish • Many North Saami speakers have reclaimedthelanguage as adults • Language contact and 2nd languagelearnerscan lead to morphologicalsimplification(Trudgill 2002, McWhorter 2007, Bentz & Winter 2013) • In thissituation, theremay be an advantage for themorphologicallysimpler form: Refl
Refl is builtentirelyofotherwiseexistingmorphology Refl = Gen/Accreflexivepronoun + substantive • Gen/Accreflexivepronoun has 9 forms: • Sg1 iežan • Sg2 iežat • Sg3 iežas • Du1 iežame • Du2 iežade • Du3 iežaska • Pl1 iežamet • Pl2 iežadet • Pl3 iežaset A substantive has 10 forms: guoibmi “partner” • NomSgguoibmi • GenSg=AccSgguoimmi • IllSgguoibmái • LocSgguoimmis • ComSg=LocPlguimmiin • NomPlguoimmit • GenPl=AccPlguimmiid • IllPlguimmiide • ComPlguimmiiguin • Ess guoibmin
NPxrequiresa largequantityofuniquemorphology -- See Handout • [N. Saami has 3 types ofsubstantivestems: vowelstems, consonantstems, and contractedstems] • NPxexpandstheparadigmof a substantive from 10 forms to 91 • see 81 additional forms for guoibmi “partner” onhandoutwith forms involvingNPx-uniquemorphologyboldfaced • Therearetwo full setsof 9 possessive suffix forms, onesetattaches aftervowels and oneset attaches afterconsonants (compare Gen/AccSgwithIllSg in handout) • NPxconditionsuniquechanges in case endings: Illsg-i/-ii > -s-/-asa-; LocSg-s/-is > -st-/-isttá-/-istti-; IllPl-ide/-iidda> -idas-/-iiddás- • With NPxcertain case endings have additionalmorphophonemic variants dependingonthe type of stem: LocSg, Com Sg=LocPl, AccPl=GenPl, IllPl • NPxconditionsadditionalmorphophonemicalternation in the stem, e.g. i ∼ á • NPxrequiresinsertionofthepossessive suffixinsidetheComitativePlural ending
5. A newvocative? • Nominative + possessive suffixmay be evolvinginto a newVocative • In preceedingstatisticsweexcludedExophoric Reference • Nearly all examplesofExophoricuseareNPx, and half ofthosearewhatwecall “ExophoricVocative”: Gula, mánážan. (KP2: 6) mánážan child.dim.nom.sg.px.1s “Listen, oh my (little) child.” • Exophoricvocative: • Always: NPx, Nominative, 1Sg reference • Often: Diminutive, Proper Names • Note thatNomPl+possessivesuffix is extremely rare, restrictedonly to 1Sg reference and address forms • NPxwithNom 1Sg may be leavingtheparadigm to become a derived form ofaddress (cf. Danièl’ 2009, Andersen 2012 onrecentevolutionof a newvocative in Russian)
Conclusions • ReplacementNPx > Refl is ongoinglanguagechangeshaped as S-curve • This change is not easilyexplained by frequency or alienable vs. inalienable • Possiblefactors: • Refl is more flexiblesyntactically • Refl is more flexiblesemantically • Refl is morphologicallysimpler • ParadigmofNPx is undermined by evolutionofnewVocative