precision performance and maximized drainage n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Precision Performance and Maximized Drainage PowerPoint Presentation
Download Presentation
Precision Performance and Maximized Drainage

Loading in 2 Seconds...

play fullscreen
1 / 25

Precision Performance and Maximized Drainage - PowerPoint PPT Presentation


  • 89 Views
  • Uploaded on

Precision Performance and Maximized Drainage. CONCEPT. PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf and PDS 2x2 Tile Onto base Into drains. THE COMPLETE SYSTEM. FieldTurf. PDS Tile. Crushed Stone. Concrete.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

Precision Performance and Maximized Drainage


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
concept
CONCEPT
  • PDS tile installed on concrete base
  • FieldTurf installed over the tile
  • Water flows:
    • Through Turf and PDS 2x2 Tile
    • Onto base
    • Into drains
the complete system
THE COMPLETE SYSTEM

FieldTurf

PDS Tile

Crushed Stone

Concrete

the complete system in action
THE COMPLETE SYSTEM – In Action

FieldTurf

PDS Tile

Crushed Stone

Concrete

roof top anchoring special case
Roof Top Anchoring – Special Case

Wall

FieldTurf

Adhesive

Angle Iron

PDS Tile

Crushed Stone

Concrete

major benefits
MAJOR BENEFITS
  • Precision Performance
  • Maximized Drainage
  • Installation Friendly
  • Reduced Installation Time
  • Minimized Base Cost
precision performance
PRECISION PERFORMANCE
  • Surface Consistency
    • Uniform surface…anywhere
    • 64 squares conform to surface
    • No “bridging”
precision performance1
PRECISION PERFORMANCE
  • Exceptional Load Bearing Capacity
    • Max load at yield is 164 psi
      • 4.3 times greater than competition
    • Design safety factor of 2.7
      • Competitor is 0.62…not much safety
    • 1,088 legs and roman arches
      • Support and distribute stresses
      • Delivers long term performance
precision performance2
PRECISION PERFORMANCE
  • Thermal Expansion and Contraction
    • PDS Tile will install flat in “heat”
    • 224 thermal “u” joints per 2x2 tile
      • Bi-directional 0°-90°
    • “Slack” in “Smart Clip”
      • Bi-directional
      • Ensures easy assembly
precision performance3
PRECISION PERFORMANCE
  • Tri-Axial Design
    • 0°/ 90°/±45° resists bending and twisting
    • Grid holes less than 9/16” wide
      • Eliminates “dip” causing gaps by 77%
  • Turf Grip
    • 18 Small “bumps” per small square
    • Edges of Tri-axial design
    • Infill acts as ballast
    • Turf stays in place. Sure footed.
maximized drainage
MAXIMIZED DRAINAGE
  • Maximized Volume Voids
  • Unequalled Vertical Permeability
  • Unparalleled Horizontal Transmissitivity
  • Outstanding Support
maximized drainage1
MAXIMIZED DRAINAGE
  • Maximized Volume Voids
    • PDS tile has 84% volume voids
      • It’s more about what’s not there
    • Typical competitive product has 35%
    • PDS tile guarantees drainage
maximized drainage2
MAXIMIZED DRAINAGE
  • Unequalled Vertical Permeability
    • PDS tile has 71% surface voids
    • Ensures water flow through turf/tile
    • PDS tile never holds back water
maximized drainage3
MAXIMIZED DRAINAGE
  • Unparalleled Horizontal Transmissitivity
    • Optimized number of legs
      • Ensures horizontal flow
    • Optimized leg ht
      • Maximizes below tile volume
    • Lab tested (ASTM)
      • PDS tile drains 153 times better than competitive product
    • All this…in a low profile ½” design

0.172

0.328

maximized drainage4
MAXIMIZED DRAINAGE
  • Outstanding Support
    • 1,088 legs
      • 1.93 legs/si
      • 19% leg area/si
      • No load concentration
      • Better than a bed of nails!
    • Leg Beveling
      • Smooth “edges”

Added radii to bottom of legs

installation friendly
INSTALLATION FRIENDLY
  • Lightweight design
    • 1.468 lbs for 3.92 sf of tile
    • Easy to handle, speeds up install
    • Easy to cut
  • 8 “Smart Clips”
    • Provide firm positive lock
  • Beveled “teeth” in clip
    • Allows for easy tile removal
  • Small rotation in Smart Clips
    • Installer can roll up the tile
    • Temporarily place it aside if required

8 Smart Clips

pds tile transition joint
PDS TILE – Transition Joint

Face this way

Align with Centre

Install PDS Joint

FTTK Logo Bottom Left

FTTK Logo Bottom Left

Face this way

PDS Joint (Green)

reduced installation time
REDUCED INSTALLATION TIME
  • Installed in 50% less time
  • Increased installation capacity
  • Use PDS…make $$

Liner

Crushed Stone

Natural Soil or Fill

minimized base cost
MINIMIZED BASE COST
  • Save significantly on base cost
    • Depending on location
  • Use PDS…save $$ !!!

Liner

Crushed Stone

Natural Soil or Fill

pds tile manufacturing
PDS TILE MANUFACTURING
  • Currently
    • Less than 4 days
    • = 80,000 sf
  • By Nov 2007
    • Less than 2 days
  • High Capacity
pds installations 2 stone liner
PDS Installations: 2” Stone, Liner
  • Approx. 500,000 sf installed
    • 5 fields in total
    • PDS is validated
  • Over 1 MM sf by 2008 Q1
  • Varied climates
    • Hot, Cold, Wet