R2E Point 5 mini safe room cooling / ventilation PowerPoint Presentation
Download Presentation
R2E Point 5 mini safe room cooling / ventilation

Loading in 2 Seconds...

play fullscreen
1 / 13

R2E Point 5 mini safe room cooling / ventilation - PowerPoint PPT Presentation


  • 90 Views
  • Uploaded on

R2E Point 5 mini safe room cooling / ventilation . A. L. Perrot , 30 th April 2013. OPTIONS proposed on Friday 26 th April (brainstorming EN/EL, EN/CV, GS/SE, MEF-INT, R2E team). Option 1:

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'R2E Point 5 mini safe room cooling / ventilation' - tala


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide2

OPTIONS proposed on Friday 26th April

(brainstorming EN/EL, EN/CV, GS/SE, MEF-INT, R2E team)

Option 1:

cooling ensured via apertures of 120 mm or 100 mm located at the bottom of the equipment (@ the level of the metallic structure of the safe room) along the whole safe room (18m); air pulsed from UTAs (?) located in UL557.

Actions: - EN/MEF: show the corresponding models;

- CE: check the feasibility, number of ducts and distance in between;

- R2E: discuss the integration feasibility with GS/ASE-DI/ODH team;

- CV: calculate the efficiency of such a cooling (UTAs located in UL557- machine side)

Option 2:

cooling = air pulsed below in the metallic structure from UTAs located in UL557; 2 additional ducts to be drilled in the wall between UL557/UL558 and UL557/CMs to ensure air arrival from UTAs; cables would arrive from top in between equipment in safe room to liberate as much as possible space below the equipment in the metallic structure.

Actions: - EN/MEF: show the corresponding models;

- CV: calculate the efficiency of such a cooling (UTAs located in UL557- machine side)

slide3

OPTIONS proposed on Friday 26th April

(brainstorming EN/EL, EN/CV, GS/SE, MEF-INT, R2E team)

Option 3:

Safe room moved as close as possible to its initial location (when position of the ducts was decided). Cooling ensured via primary solution proposed by CV.

Actions: - MEF-INT: show the corresponding models;

- CV: calculate the efficiency of such a cooling ;

Option 4:

Cooling ensured via lateral air pulsed from UL557 via a new duct to be drilled close to the safe room; need to relocate a vertical cable tray; UTAs located in UL557.

Actions: - MEF-INT: show the models;

- CV: calculate the efficiency of such a cooling ;