1 / 8

ME4182 Progress Report

ME4182 Progress Report. Team: Future Crew Technologies Chris Biggers Simon Cole Chuck Devane Ray Cortes Victor Renteria Tejuan Rowe Professor: Dr. Lipkin Date: September 5, 2001. Agenda. Problem Statement Design Partition Project Plan Task Assignments. Problem Statement.

stefanie
Download Presentation

ME4182 Progress Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ME4182 Progress Report Team: Future Crew Technologies Chris Biggers Simon Cole Chuck Devane Ray Cortes Victor Renteria Tejuan Rowe Professor: Dr. Lipkin Date: September 5, 2001

  2. Agenda • Problem Statement • Design Partition • Project Plan • Task Assignments

  3. Problem Statement • Design a new fuel tank for the test vehicle (2002 Ford Explorer) • Design casing for battery, electronics, and controller • Safety test new fuel tank • Perform engineering analysis on the battery casing • Consider impact of the additional weight on vehicle performance • Install newly designed componentson test vehicle

  4. Design Partition • “Take Apart the Truck” • Remove spare tire • Remove gas tank / fuel lines • Dismantle exhaust system

  5. Design Partition (cont.) • Design the new parts • Gas tank configuration • Battery box configuration • Reroute fuel lines • Determine fuel pump size / flow rate • Material Design • Select battery box material / fasteners • Select gas tank material / fasteners

  6. Project Plan • Each member was assigned specific tasks • Each task has its own due date • The team will critique the individual work in progress to then integrate into overall design • Order and manufacture necessary parts • Assemble the new parts into the truck

  7. Task Assignments • Conceptual Designs - Group • Patent/Product Search - Chris Biggers • Selection Analysis (HOQ) - Chuck Devane • Design Partition (Function Tree) - Victor Renteria • Presentations - Group • Layout Drawings - Simon Cole • Engineering Analysis - Ray Cortes

  8. Task Assignments (cont.) • Part Drawings - TeJuan Rowe • Prototype Building - Chris, Chuck, Ray • Prototype Testing - Simon, TeJuan, Victor • Posterboard Display - Chris, Chuck • Final Paper - Group • Website - Simon Cole