Progress Report. Reverse Engineering of a Radio Controlled Car Team The C.O.R.E Presenters: Moemen Taha Ranuk de Silva The Petroleum Institute Abu Dhabi, United Arab Emirates. Outline. Introduction Work Completed Work In Progress Work Remaining. Introduction.

1 / 17

Download Presentation

Progress Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress Report Reverse Engineering of a Radio Controlled Car Team The C.O.R.E Presenters:MoemenTaha Ranuk de Silva The Petroleum Institute Abu Dhabi, United Arab Emirates

  2. Outline • Introduction • Work Completed • Work In Progress • Work Remaining

  3. Introduction • Purpose: The project is about improving the radio controlled car’s performance by enhancing its aerodynamics, decreasing its weight and increasing battery life. • This presentation will give an outline of the total project including the key milestones and the budget

  4. Work Completed • Around 80% of the project • Product dissection with documentation • COSMOSFloWorks analysis • Speed test • Battery life test • Sustainability test • The CAD design for the prototype created • Budget accumulated: AED 33,120

  5. COSMOSFloWorks analysis

  6. Conceptual designs Design 1 Design 2

  7. COSMOSFloWorksanalysis Design 1 Design 2

  8. COSMOSFloWorksanalysis Original Design Design 2

  9. Speed and Battery Test • Speed test • Same type of batteries • Same test conditions (time of day, distance, temperature, etc) • Average speed = 1.5 m/s • Battery test • Same type of batteries • Same amount of usage in the same conditions • Battery life = 00:32:04

  10. Sustainability test

  11. Sustainability test

  12. Sustainability test

  13. GANTT Chart

  14. Work In Progress • Research being done on environmental and human factors • Weight analysis • Cost analysis • Final report by 16th May

  15. Work Remaining • Final presentation and poster by 18th May • Building the prototype by the 16th of May.

  16. Pleasefeel free to askany questions Thank you for your time!