An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress Report V.Ivanchenko 16 September 2008

  2. Outline • Validation plots for 9.1ref07 • Modifications in hadronic/management • Nuclear masses in G4 hadronics • Natural abundances in G4 hadronics 16.09.08 V.Ivanchenko

  3. 16.09.08 V.Ivanchenko

  4. 16.09.08 V.Ivanchenko

  5. 16.09.08 V.Ivanchenko

  6. 16.09.08 V.Ivanchenko

  7. 16.09.08 V.Ivanchenko

  8. 16.09.08 V.Ivanchenko

  9. Summary for 9.1ref07 • Neutron production at low energy have been improved by Jose Manuel • Other distributions are stable • There is a problem in Bertini for forward neutron production at 1.2 GeV 16.09.08 V.Ivanchenko

  10. Cleanup in hadronic/management • G4HadronicProcessStore • Include stopping and CHIPS processes • Next step – add hadronic model names (FTFP, QGSP) in hadronic Physics Lists • G4HadronicProcess base class were upgraded • No run time call to environment variables • No run time check of cross section data store • Direct fill Z and A in the G4VCrossSectionDataStore • Some performance improvement is expected 16.09.08 V.Ivanchenko

  11. Motivation to look into masses (9.1ref-07) p + Pb 600 MeV 16.09.08 V.Ivanchenko

  12. Nuclear Masses in G4 hadronics • The problem of 4-momentum balance may be in the code or in the test • Definitions: • MN(Z,A) – mass of the isotope (nuclear mass) • (MA(Z,A) + Z*me – Be)- atomic mass • (MA(Z,A) – A) - mass excess • (Z*mp + (A-Z)mn – MN(Z,A)) – binding energy 16.09.08 V.Ivanchenko

  13. How access a nuclear mass in G4? • NucleiProperties public methods (first author V.Lara): • Static GetMassExcess(const G4int A, const G4int Z) • Static GetAtomicMass(const G4double A, const G4double Z) • Static GetBindingEnergy(const G4int A, const G4int Z) • In reality it is Weitzsaeker’mass formula • Static GetNuclearMass(const G4double A, const G4double Z) • In these methods pow function, string comparison and a lot of “if” operators are used • There are calls to G4NucleiPropertiesTable and G4NucleiPropertiesTheoreticalTable • This class was developed by V.Lara in 1998 and migrated to particle category in 1998 • One can express concerns to not optimal implementation • It seems that there is a bug in He3 and He4 atomic masses 16.09.08 V.Ivanchenko

  14. How access a nuclear mass in G4? • GetNucleiPropertiesTable – container of the data – public methods • Static GetMassExcess(G4int Z, G4int A) • Static GetNuclearMass(G4int Z, G4int A) • Static GetBindingEnergy(G4int Z, G4int A) • Static GetBetaDecayEnergy(G4int Z, G4int A) • Static GetAtomicMass(G4int Z, G4int A) • IsInTable(G4int Z, G4int A) • Static G4int MaxZ(G4int A) MinZ(G4int A) • Data table are for the MassExcess; author V.Lara, data from G.Audi et al. Nucl. Phys. A595 (1995) 409; • PDG recommendation: • G.Audi et al. Nucl. Phys. A 729 (2003) 337 • Authors point out that in experiments mainly atomic mass is measured, other values are computed 16.09.08 V.Ivanchenko

  15. How access a nuclear mass in G4? • G4NistManager: • GetIsotopeMass(G4int Z, G4int A) • G4AtomicMass(G4int Z, G4int A) • Data from NIST DB atomic masses transferred to Geant4 NIST DB in 2005 • Very fast access to isotope mass • Return 0.0 if isotope is not in the table • NIST DB is used to construct G4Isotope, G4Element, G4Material, • Masses from NIST are used only in few EM processes • G4Nucleus: • GetAtomicMass(const G4double A, const G4double Z) • Inside the direct call !: G4NucleiProperties::GetNuclearMass(G4double A, G4double Z) • G4ParticleDefinition::GetAtomicMass() // nuclear mass! 16.09.08 V.Ivanchenko

  16. The most big difference for the given Z ΔMmax (MeV) Z 16.09.08 V.Ivanchenko

  17. Which atomic masses to use? • NIST data are less precise (1 digit less) • PDG data are the most precise (1 digit more) 16.09.08 V.Ivanchenko

  18. Summary on mass mini-review • G4NucleiProperties provide precise masses from review 1995 • PDG recommendation based on 2003 publication • Atomic masses of He ions need to be fixed • NIST data provided with 1 digit less accuracy • Implementation of G4NucleiProperties is not optimal: • String comparisons, pow function, indirect computation • There are difficulties with method names: • some models use AtomicMass , • some – NuclearMass, • some call for AtomicMass and get NuclearMass • some call for MassExcess • There are different methods to get mass and not obvious what is the best 16.09.08 V.Ivanchenko

  19. What can be done in short term? • Find out and fix all places were atomic mass is used • Bertini, Abla, tests • If possible use G4NucleiProperties::GetNuclearMass • Improve G4NucleiProperties::GetNuclearMass • Substitute string comparison by pointer comparison • Reduce number of “if” operators • Tabulate electron binding energy to avoid call to pow function • Singleton with inline methods or static? 16.09.08 V.Ivanchenko

  20. What can be done in long term? • PDG masses should be taken • Unique fast method to get nuclear mass should be provided • Rename methods, so function is corresponding to the name • Remove unnecessary methods 16.09.08 V.Ivanchenko

  21. Natural abundances • The maximum difference for given Z is shown • Values from NIST and GHAD are very close • Some isotopes present in NIST and not in GHAD • No problems for important Z • No references in GHAD class: the source of the data unknown • Likely the update of the GHAD class should be planned 16.09.08 V.Ivanchenko