Status of the Planning Working Group’s (PWG) Efforts. Andrew Fusco May 12, 2006. Agenda. Purpose of the PWG 2006 NCTPC process PWG efforts to date Next steps. Purpose of the PWG. Coordinates the development of the transmission studies to support the NCTPC Establishes a base case model

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Status of the Planning Working Group’s (PWG) Efforts' - sopoline-abbott


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
agenda
Agenda
  • Purpose of the PWG
  • 2006 NCTPC process
  • PWG efforts to date
  • Next steps

DRAFT

slide3

Purpose of the PWG

  • Coordinates the development of the transmission studies to support the NCTPC
    • Establishes a base case model
    • Performs Resource Supply Option studies – focused on reliability
    • Performs Enhanced Access studies – focused on power supply economics
    • Develops cost and schedule estimates

DRAFT

slide4

Reliability Planning

PWG coordinates the study analysis, identifies reliability problems, develops solutions with estimates of costs and schedules

PWG evaluates reliability problems and current transmission upgrade plans

Participants and TAG review the reliability study results

PWG develops and the OSC approves the reliability study scope

OSC selects reliability and enhanced access solutions; checks for improved reliability through enhanced access solutions

OSC creates final draft Collaborative Plan

Feedback and Iterative Studies

Participants and TAG recommend scenarios and interfaces. The OSC selects interface and scenario studies for analysis

PWG develops and the OSC approves the enhanced access study scope

PWG coordinates the study analysis, identifies access problems, develops solutions with estimates of costs and schedules

Participants and TAG review the enhanced access study results

TAG feedback on final draft Collaborative Plan

OSC approves final Collaborative Plan

Enhanced Transmission Access Planning

Participants’ resource planning processes

NCTPC Process Flowchart

DRAFT

slide5

Reliability Planning Process

  • Evaluate current reliability problems and transmission upgrade plans
  • Develop Reliability Study Scope
  • Perform analysis, identify problems, and develop solutions
  • Review Reliability Study Results

Enhanced Access Planning Process

  • Propose and select enhanced access scenarios and interface
  • Develop Enhanced Access Study Scope
  • Perform analysis, identify problems, and develop solutions
  • Review Enhanced Access Study Results

Collaborative Plan Development

  • Combine Reliability and Enhanced Results
  • OSC publishes DRAFT Plan
  • TAG review and comment

1st Quarter 2nd Quarter 3rd Quarter 4th Quarter

2006 Overview Schedule

TAG Meetings

DRAFT

slide6

Reliability Planning

PWG coordinates the study analysis, identifies reliability problems, develops solutions with estimates of costs and schedules

PWG evaluates reliability problems and current transmission upgrade plans

PWG develops and the OSC approves the reliability study scope

Participants and TAG review the reliability study results

OSC selects reliability and enhanced access solutions; checks for improved reliability through enhanced access solutions

OSC creates final draft Collaborative Plan

Feedback and Iterative Studies

TAG feedback on final draft Collaborative Plan

Participants’ resource planning processes

OSC approves final Collaborative Plan

NCTPC Process Flowchart - REVISED

DRAFT

slide7

Reliability Planning Process

  • Evaluate current reliability problems and transmission upgrade plans
  • Develop Reliability Study Scope
  • Perform analysis, identify problems, and develop solutions
  • Review Reliability Study Results

Collaborative Plan Development

1st Quarter 2nd Quarter 3rd Quarter 4th Quarter

2006 Overview Schedule - REVISED

  • FinalizeReliability Results
  • OSC publishes DRAFT Plan
  • TAG review and comment

TAG Meetings

DRAFT

pwg efforts to date
PWG Efforts to Date
  • First PWG meeting in September 2005
  • Sept – Dec: Compared reliability planning assumptions used by Duke and PEC
  • Oct – Jan: Developed scope for 2006 reliability study

DRAFT

pwg efforts to date1
PWG Efforts to Date
  • Dec – Jan: Provided data for base case development
    • Load and resource forecasts
    • Dispatch order for resources
    • Coordinated interchange
    • Contingency and monitored line lists

DRAFT

pwg efforts to date2
PWG Efforts to Date
  • Jan – Feb: Developed merged detailed base case
  • Feb – Mar: Developed potential alternative resource options for study
  • Mar – Apr: Performed base case and some generator maintenance reliability screenings
  • Apr: Reviewed initial reliability screenings

DRAFT

next steps
Next Steps
  • Complete studies for Resource Supply Options
  • Identify reliability problems
  • Develop solutions
    • Develop technical solutions
    • Develop cost and schedule estimates for solutions
  • Recommend alternative resource options for study

DRAFT