An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 1

    2. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 2

    3. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 3 PROPANE ONLY Plant Configuration

    4. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 4 UTILITY GAS & PROPANE Plant

    5. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 5 Local Access Take-Off Facility for Natural Gas / Propane 10 mmscfpd gas take-off (very small facility) Fuel North Pole’s new 60 mega-watt power plant Fairbanks potential gas demand is two to three times this size Supply combined TAPS PS & Compressor Station twice over Supply a major mine development Propane available is 4,000 gal/day (80% recovery) Design uses off-the-shelf skid-mounted equipment Installed cost is $10.5 million Facility cost-of-service: 50 to 75 cents /gal propane 30 cents / mmbtu of gas

    6. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 6

    7. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 7 Potential Take-Off Locations for Natural Gas / Propane Galbraith Lake * Coldfoot * Yukon River Fairbanks North Pole Delta * Tok * Glennallen (spur line) Palmer (spur line) Valdez Canadian Highway Beaver Creek * Haines Junction * Whitehorse

    8. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 8

    9. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 9

    10. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 10