Overview of Natural Gas and Propane Take-Off Facilities in Alaska
This presentation discusses various aspects of natural gas and propane take-off facilities as proposed during the hearing on September 2, 2004. It highlights the configurations of propane-only and utility gas plants, including potential locations for gas take-off such as Fairbanks and Coldfoot. Key details include the estimated facility cost of $10.5 million, production capacities, and potential market demands for gas and propane. Emphasis is placed on the technology used and the economic feasibility of providing services to power plants and local communities.
Overview of Natural Gas and Propane Take-Off Facilities in Alaska
E N D
Presentation Transcript
1. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 1
2. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 2
3. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 3 PROPANE ONLY Plant Configuration
4. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 4 UTILITY GAS & PROPANE Plant
5. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 5 Local Access Take-Off Facility for Natural Gas / Propane 10 mmscfpd gas take-off (very small facility)
Fuel North Poles new 60 mega-watt power plant
Fairbanks potential gas demand is two to three times this size
Supply combined TAPS PS & Compressor Station twice over
Supply a major mine development
Propane available is 4,000 gal/day (80% recovery)
Design uses off-the-shelf skid-mounted equipment
Installed cost is $10.5 million
Facility cost-of-service:
50 to 75 cents /gal propane
30 cents / mmbtu of gas
6. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 6
7. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 7 Potential Take-Off Locations for Natural Gas / Propane Galbraith Lake *
Coldfoot *
Yukon River
Fairbanks
North Pole
Delta *
Tok *
Glennallen (spur line)
Palmer (spur line)
Valdez
Canadian Highway
Beaver Creek *
Haines Junction *
Whitehorse
8. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 8
9. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 9
10. Hearing on 9/2/04 ANGDA Presentation - Gas Take-Off 10