This document provides a detailed overview of the HYSPEC project as of June 16, 2010, focusing on shielding specifications and the installation of key components. Key highlights include progress on external building shielding (15-33m), the chopper box installation, and updates on the detector vessel design, which is currently in procurement. Additional details encompass the delivery of shield blocks, installation of the secondary shutter, and the status of the monochromator, including lead pour updates. A removable hatch and O-ring provisions are also discussed for collimator access.

skyler
Download Presentation

HYSPEC Overview: Shielding and Detector Installation Updates (June 16, 2010)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HYSPEC status June 16, 2010

  2. HYSPEC Overview 6~15m Shielding External building 15~33m Shielding Chopper Box B Shielding Drum Shield Sample position Detector Vessel

  3. Detector Vessel,designed and inprocurement

  4. Removable hatch for course collimator access 1/8” O-Ring Front section removable ¼” O-Ring (Hidden)

  5. PIP Shield all in, &Guide installation

  6. Secondary shutter being installed

  7. Shield blocks delivered

  8. Shield blocks getting ready

  9. Monochromator delivered

  10. Monochromator Shield component lead pours