780 likes | 1.03k Views
Restore Iraqi Oil. A Chronology and Highlights of Boots & Coots in Iraq. A RealKick. Iraq. “The Cradle of Civilization”. Iraq – 24 Million People. Size of California. Texas has 21 Million People. What Ancient Iraq Gave Humanity. Grain Agriculture First writings of Ag techniques
E N D
A Chronology and Highlights of Boots & Coots in Iraq A RealKick
Iraq “The Cradle of Civilization”
Iraq – 24 Million People Size of California Texas has 21 Million People
What Ancient Iraq Gave Humanity • Grain Agriculture • First writings of Ag techniques • Land Cultivation • Double Entry Accounting • The Wheel and the Plow • Math system based on 60 (seconds & minutes) • Banking
Iraq’s accomplishments cont. • 1st Written Alphabet • Noah & the Garden of Eden • Eye for an Eye, a tooth for a tooth legal system • 360 deg in a circle • The Zero • The Arabic number system (although we use different symbols than original) [٠١٢٣٤٥٦٧٨٩]
Boots & Coots Involvement in the Iraqi ConflictBackground • During 1991 Gulf War - B&C was one of the lead Firefighting Companies. Others Red Adair & Wild Well Control. • After retirement of Coots, Boots & Red => The 1997 merger of B&C with Red Adair’s employees
Boots & Coots Involvement in the RIO ProjectBackground • There are over 2,000 oil wells in Iraq. • 1991 Gulf War – Hussein sabotaged 849 wells. Of those, 732 required blowout intervention.
Boots & Coots Involvement in the RIO ProjectPlanning Assignment: Position equipment & personnel to respond to sabotage well fires and be there to help restore production. Developed a scenario for oil well sabotage • Best Case ~40 wells on fire • Worst Case ~1,414 wells on fire • Most Probable Case ~464 wells on fire
Boots & Coots Involvement in the RIO ProjectPreparation • Finalized blowout contingency plan October 2002, signed contracts. • Mobilized to Kuwait City in January and February 2003. • Helped train 12 military teams charged with securing oilfield infrastructure in the South. • Procured and expedited equipment.
Boots & Coots Involvement in the RIO ProjectEquipment • 4 complete fire fighting packages • 12 capping wellhead assemblies • 2 sets of oil well testing equipment • Misc. wellhead repair equipment & valves
March 2003 Boots & Coots 12 men on stand-by in Kuwait City Staged and Prepared Equipment Consulted Directly with Military
Preparation for War We’re Good To Go!
March 20, 2003War Begins • Air strikes commence • Hussein orders sabotage of wells
Scud Alerts were Everyday @ first of War & several times a day Lightning! Lightning! Lightning!
At…Camp ArifjanVaccinations for Anthrax& Small PoxIssued NBC (Nuclear, Biological & Chemical) Gear and Gas Mask. Must have on person 24 hrs/day
The Fires Sabotage was attempted on several hundred wells. Four wells were ignited, and twelve others were badly damaged.
SupplyRoute Through Oil Field US convoy moving through oilfield toward Baghdad
Dallas Breach – 1 of 3 Roads across DMZ from Kuwait to Baghdad Texas Influence Flak Jackets are in Fashion
Immediately across DMZ on Iraqi soil is: Hussein's Ditch Miles… 25 feet 18 feet The plan was to fill with oil & burn
Satellite Image of Well fires Iraq Iran Dallas Breach Kuwait You would be here
EOD StaffExplosive Ordinance Disarmament First - Sweep area for Mines
Mine Fields Everywhere Anti-Personnel Mines
Cluster Munitions This was fresh but we found stuff from 1991 still around
Sabotaged Well Head Explosive Charge Detonated without Damage
Bomb Placement • C4 and sandbags placed between 71/6’’ valve and 11’’ flange • Detonation by remote and via phone lines • Secondary incendiary device used to ignite well
Kuwait Wild Well Killers Aisa Bou Yabes (KOC) Team Leader KWWK KWWK Controls 1st Fire In Iraq
Well Control Operations An Awesome Place to Work