An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CS121: Software Development

  2. Today • Importance of software development • Software methodologies • Overview of course • First assignment • Administrative issues

  3. We need software to …. Customer Developer Here it is … Customer Developer “Software Development” …later in themillennium…

  4. Key Processes • Requirements • Design • Implementation • Testing

  5. We need software to …. Customer Developer Here it is … Customer Developer “Software Development” …later in themillennium… It broke! Customer Developer

  6. Key Processes • Requirement • Design • Implementation • Testing • Maintenance

  7. Key Processes • Requirement • Design • Implementation (focus of CS70) • Testing • Maintenance

  8. Why study software development? • Society has become increasingly dependent on software systems. • How many software systems do you interact with every day?

  9. Why study software development? • Society has become increasingly dependent on software systems. • Failures in software systems can be costly and dangerous.

  10. Expedia Maps: I need to go to the airport (1999) 10 mi.

  11. Output reported in The Risks Digest     Oct. 1, 1999 Excerpts from Expedia Maps directions: From: Laurel, Maryland To: Baltimore-Washington International Airport, Maryland Driving Distance: 5865.1 miles Time: 9 day(s) 3 hour(s) 22 minute(s) Time (hour:minute) Instruction 0:00 Depart Laurel, Maryland 1:01 Entering Delaware 1:17 Entering New Jersey 3:24 Entering New York 3:51 Entering Connecticut 5:51 Entering Massachusetts 7:29 Entering New Hampshire 7:44 Entering Maine 12:20 Entering New Brunswick 20:20 Take the North Sydney-Argentia Ferry 34:32 Entering Newfoundland 36:35 Turn left onto Local road(s) (4543.1 mi) 219:22 Arrive Baltimore-Washington International Airport, Maryland

  12. Why study software development? • Society has become increasingly dependent on software systems. • Failures in software systems can be costly and dangerous

  13. Therac-25 • Linear accelerators create high- energy beams that can destroy tumors with minimal impact on the surrounding healthy tissue • Therac 25 was the first linear accelerator with dosage controlled solely by software (as opposed to hardware)

  14. 1983: Pre-release Safety Analysis • Programming errors have been reduced by extensive testing on a hardware simulator and under field conditions on teletherapy units. Any residual software errors are not included in the analysis. • Program software does not degrade due to wear, fatigue, or reproduction process. • Computer execution errors are caused by faulty hardware components and by "soft" (random) errors induced by alpha particles and electromagnetic noise.

  15. and then … • 1983: First Therac 25 installed • 1985-1987: Six massive-overdose accidents due to “software error” are reported. Overdoses caused severe burns and death. • 1987: Recalled for extensive design changes, including hardware to safeguard against software errors in dosage.

  16. Why study software development? • Society has become increasingly dependent on software systems. • Failures in software systems can be costly and dangerous • Software design/development is HARD!

  17. FAA • 1981: FAA announced plans to modernize air-traffic control. • 1985: IBM awarded contract. System estimate to have 1.5 million lines of code, cost$2.5 billion, and be deployed by 1991. • 1987: Revised cost $4.3 billion, deployment slipped to 1995. • 1994: FAA decided that the project would never be completed, and cancelled it. Net loss$1.5 billion

  18. Stats on software projects J. Johnson, “Creating Chaos,” American Programmer, July 1995 • 31.1% are canceled before they are finished • 52.7% overrun their cost estimates by at least 189% • 33.3% overrun their time estimates by 100%-200% • 94% of all projects do a “restart”

  19. Is there hope? Software engineering: tools, techniques, and principles to promote software quality software engineering is an evolving field

  20. Historical Perspective 1950s this is how to do it Code and fix

  21. Historical Perspective 1950s

  22. Historical Perspective 1950s 1970s that was soooooo wrong, but now we know, this is how to do it waterfall

  23. Essential Processes of Software Development • Requirements • Design • Implementation • Testing

  24. Software Life Cycle Model How to organize the key processes of software development

  25. Waterfall Model with feedback Requirements Design Implementation Test

  26. Historical Perspective 1950s 1970s

  27. What is wrong with waterfall? • Initial requirements are speculative

  28. Requirements Frederick P. Brooks Jr. in “No Silver Bullet”: “The hardest single part of building a software system is deciding precisely what to build.”

  29. Requirements Frederick P. Brooks Jr. in “No Silver Bullet”: “No other part of of the work so cripples the resulting system if done wrong. No other part is more difficult to rectify later.”

  30. 1992 Iowa State study of safety-critical errors in software systems for Voyager and Galileo: The majority of safety-critical software errors were not caused in the design or implementation process. They were due to errors in the requirements specification. The systems as specified were flawed.

  31. Requirements • Customer’s don’t usually know what they want/need • Even if they do know what they want/need, they are likely to change their minds

  32. Growth in requirements % increase in requirements during project life Source: Applied Software Measurement, Capers Jones, 1997. Based on 6,700 systems.

  33. What is wrong waterfall? • Initial requirements are speculative • Initial designs are speculative

  34. Design Design Methods: Seeds of Human Futures (Jones, 1970) “The fundamental problem is that designers are obliged to use current information to predict a future state that will not come about unless their predictions are correct.”

  35. What is wrong waterfall? • Initial requirements are speculative • Initial designs are speculative • Speculative decisions compound

  36. Complexity vs. Productivity SLOC/Person Month Source: Measures For Excellence, Putnam, 1992. Based on 1,600 systems.

  37. What is wrong waterfall? • Initial requirements are speculative • Initial designs are speculative • Speculative decisions compound • As a result we build the wrong thing that doesn’t work any

  38. Historical Perspective 1950s 1970s 1990s Don’t bite off more than you can chew.

  39. Iterative Models In each iteration: • Identify the objectives of the iteration • Design a solution to achieve the objectives • Implement the solution • Test the implementation Each iteration is a mini-waterfall process.

  40. Boehm Spiral Model • Iterations: .5 – 2 years • Risk analysis • Prototype-based Boehm (1988) was first to clearly articulate the advantages of iterative development.

  41. Agile principles • Working software, delivered regularly, is the primary measure of progress • High standards of excellence; test regularly and re-factor/redesign when necessary • Customer involvement is critical • Simplicity; just-in-time design/development • Adaptability; embrace change • Small, cross-functional, self-organizing teams of professionals

  42. Scrum Model A small group is responsible for picking up the ball and moving it toward the goal.

  43. RUP Life Cycle Phases Processes Inception Elaboration Construction Transition Business Modeling Requirements Analysis & Design Implementation Test Deployment Supporting Workflows … Configuration Mgmt Management Environment Iterations Preliminary Iteration(s) Iter.#1 Iter.#2 Iter.#n Iter.#n+1 Iter.#n+2 Iter.#m Iter.#m+1 Iterations within phases

  44. Extreme Programming

  45. Do agile methods work? 16% 29% 18% 31% 53% 53% 2004 1994 Standish CHAOS survey

  46. Software projects come in all shapes and size some are easy, many hard

  47. Harder Large Open-ended, poorly understood Cutting edge technology Inexperienced personnel Stringent requirements Easier Small Well defined Ready-to-use tools, packages Experienced personnel Flexible requirements

  48. Objectives of CS121 • Understand the problems • Understand the various solutions to the problems • Practice applying the solutions to a particular problem

  49. Project You will work in teams to design and develop an educational computer game for social science teachers at Hillside Middle School, Kalamazoo, MI