offshore petroleum discharge system opds update  jlots rd symposium vi  martin fink pms 325a 30 january 2001 Preloader

offshore petroleum discharge system opds update jlots rd symposium vi martin fink pms 325a 30 january 2001 - PowerPoint PPT Presentation


  • 683 Views
  • Uploaded on

2. OPDS Mission Requirements. PROVIDE TIMELY DELIVERY OF PETROLEUM PRODUCTS FROM AN OFFSHORE TANKER TO FORCES ASHORE WHERE PORT OR TERMINAL FACILITIES ARE DAMAGED OR NON-EXISTANTPROVIDE FUEL FROM UP TO 4 MILES OFFSHORE TO THE HIGH WATER MARK TO SUPPORT FORCES ASHOREABILITY TO PUMP PRODUCT WITHIN 48 HOURS OF ARRIVALABILITY TO PUMP UP TO 1.2 MILLION GALLONS OF PRODUCT PER DAYABILITY TO ACHIEVE FULL SYSTEM OPERABILITY IN 7 DAYSCAPABILITY TO DEPLOY SYSTEM IN SEA STATES UP TO SEA STATE 3 (S9460

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'offshore petroleum discharge system opds update jlots rd symposium vi martin fink pms 325a 30 january 2001' - sandra_john


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript