Public Management Information Systems System Analysis & Design Saturday, November 8, 2014

Public Management Information Systems System Analysis & Design Saturday, November 8, 2014. Hun Myoung Park, Ph.D. Public Management & Policy Analysis Program Graduate School of International Relations. System Development Life Cycle. I nvestigation (planning) Systems analysis Systems design

sandra-neal
Download Presentation

Public Management Information Systems System Analysis & Design Saturday, November 8, 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Public Management Information SystemsSystem Analysis & DesignSaturday, November 8, 2014 Hun Myoung Park, Ph.D. Public Management & Policy Analysis ProgramGraduate School of International Relations

  2. System Development Life Cycle • Investigation (planning) • Systems analysis • Systems design • System development • Systems implementation • System maintenance

  3. Why SDLC? • Systematic approach to give guidelines for improving efficiency and effectiveness • To avoid system failures: lack of communication (acceptance); politics (sunk costs) and leaderships; technical incompetence; education & training • Considered as conceptual model and depending on institutional settings.

  4. Caution in SDLC • Programming is a part of system development • Phases (steps) may not always be distinct and thus may overlap; Phases are interrelated and interdependence • Detecting errors in an early phase will save the cost

  5. Prototyping • Iterative approach to revise prototypes. • “During each iteration, requirements and alternative solutions to the problem are identified and analyze, new solutions are designed, …” (p. 507) • “[A]n iterative process involving analysts and users whereby a rudimentary version of an information system is built and rebuilt according to user feedback.” (p.195)

  6. Other Approaches • Rapid application development (RAD) • Agile (usage-centered) development • Extreme programming (XP) • Adaptive software development, lean software development, rational unified process, feature-driven development • Customization, fast cycles, error-correction

  7. Step 1. Investigation • Determine organization’s objectives • Business process reengineering (BPR) • Feasibility analysis (economic, legal, operational, schedule feasibility) • Describing (tangible and intangible) costs and benefits of each solutions • Propose alternative solutions (keep or revise old system, or get a new system)

  8. Step 2. System Analysis 1 • Data collection to gather data for information needs, resources, and capabilities • Data analysis for data modeling and activity modeling • Requirement analysis is to “determine user, stakeholder, and organizational needs” (p526).

  9. Step 2. System Analysis 2 • Determine the nature and scope of the project. • Sources of data • Observations of users (conversations) • Written documents • Computer-based information

  10. Step 2. System Analysis 3 • Traditional Data Collection • Interviews (individuals and groups) • Observing users • Questionnaires • Reviewing documents

  11. Step 2. System Analysis 4 • Joint application development (JAD) • A highly organized intensive workshop to bring together system owners (managers), users, and technicians (e.g., analysts, programmers, engineers) to jointly define and design systems • “[A]nalysts control the sequence of questions answered by users” (p.192)

  12. Step 2. System Analysis 5 • Computer-aided software engineering (CASE) tools • Data flow diagram (DFD), • System flowcharts (flow diagram) • Connectivity diagrams, grid charts, decision tables, • Object-oriented analysis

  13. Step 2. System Analysis 6 • Business process reengineering (BPR) • “[L]ooking for new ways to perform current tasks” rather than “automating existing processes” (p.197). • “[N]ot just to improve each business process, but, … to reorganize the complete flow of data … to eliminate unnecessary steps, achieve synergies among … separate steps…” (p.197).

  14. Step 2. System Analysis 7 • Key business processes are “structured set of measurable activities designed to produce a specific output for a particular customer or market” (p.198). • Is an activity dysfunctional? Important? Feasible? • Employ disruptive technologies that “enable the breaking of long-held business rules that inhibit …” (p.199).

  15. Data Flow Diagram 1 • A picture of the movement of data between external entities and the processes and data stores within a system • Data flow (arrow) • Process (work or actions) • Data store in rectangular • Source/sink

  16. Data Flow Diagram 2 • Context diagram or level-0 diagram • Overview of an organizational system that shows the system boundaries, external entities that interact with the system, and the major information flows between the entities and the system • Level-n diagram is a data flow diagram that is n nested decompositions from a process on a level-0

  17. Data Flow Diagram 3 • Data flow allows only one direction • Data flow from and to data store means retrieving and updating information • Process (verb) has to have input and output • Data store must be moved by a process • Source/sink

  18. Context DFD

  19. Level 1 DFD

  20. Context DFD

  21. Level 0 DFD

  22. Flowchart

  23. Step 3. System Design 1 • Logical and functional designs • Defines input/output requirements (forms and reports) • Design user interfaces and dialogues • Design database/storage (data dictionary) • SpecifiesH/W, S/W, and networking (telecommunication)

  24. Step 3. System Design 2 • System controls (I/O, process, database, telecommunication personnel control) • Rules and procedure (security, privacy, data integrity, and backups--recovery). • Described in request for proposal (RFP) specifying required resources (H/W, S/W)

  25. Highlights • Iteration, but not a one-shot game • Not a technicians’ job but all stakeholders’ jobs to improve their performances • User centered approach; keep analyzing users needs all the time • Emphasis on reliability, security, privacy especially for contracting out projects • Importance of documentation in all stages.