design and construction of usp purified water systems
Download
Skip this Video
Download Presentation
Design and Construction of USP Purified Water Systems

Loading in 2 Seconds...

play fullscreen
1 / 50

Design and Construction of USP Purified Water Systems - PowerPoint PPT Presentation


  • 578 Views
  • Uploaded on

Feed Water Analysis. . USP Purified Water System

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Design and Construction of USP Purified Water Systems' - sabin


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
usp purified water system feed water analysis
USP Purified Water System – Feed Water Analysis
  • Official Monograph
    • United States EPA NPDWR
    • Equivalent European Regulations
    • Equivalent Japanese Regulations
    • World Health Organization Reference
usp purified water system feed water analysis4
USP Purified Water System – Feed Water Analysis
  • United States EPA – National Primary Drinking Water Regulations (NPDWR)
    • Regulated Items
    • Total Viable Bacteria
    • “Private” Water Supplies
slide5
USP Purified Water System – Feed Water Analysis
  • Regulated Items - Microorganisms
    • Cryptosporidium
    • Giardia lamblia
    • Legionella
    • Total Coliform
    • Turbidity
    • Viruses
slide6
USP Purified Water System – Feed Water Analysis
  • Regulated Items – Disinfection Byproducts
    • Bromate
    • Chlorite
    • Haloacetic Acids (HAA5)
    • Total Trihalomethanes (TTHMs)
slide7
USP Purified Water System – Feed Water Analysis
  • Regulated Items – Disinfectants
    • Chlorine
    • Chloramines
    • Chlorine Dioxide
usp purified water system feed water analysis8
USP Purified Water System – Feed Water Analysis
  • Regulated Items – Inorganic Chemicals
    • Antimony
    • Arsenic
    • Asbestos
    • Barium
    • Beryllium
    • Cadmium
    • Total Chromium
    • Copper
usp purified water system feed water analysis9
USP Purified Water System – Feed Water Analysis
  • Regulated Items – Inorganic Chemicals
    • Cyanide
    • Fluoride
    • Lead
    • Mercury
    • Nitrate
    • Nitrite
    • Selenium
    • Thallium
usp purified water system feed water analysis10
USP Purified Water System – Feed Water Analysis
  • Regulated Items – Organic Chemicals (53 Total)
    • Sewage/Wastewater Treatment
    • Herbicides
    • Landfill Leachates
    • Chemical/Industrial Facility Waste
    • Fumigants
    • Petroleum /Refinery Waste
    • Insecticides
usp purified water system feed water analysis11
USP Purified Water System – Feed Water Analysis
  • Regulated Item – Radionuclides
    • Alpha Particles
    • Beta Particles and Photon Emitters
    • Radium 226
    • Uranium
usp purified water system feed water analysis12
USP Purified Water System – Feed Water Analysis
  • Total Viable Bacteria
    • No limit in NPDWR
    • Total Coliform (Confirmed as Fecal Coliform or E. coli, used as indicator)
    • “Action Limit” of 500 cfu/ml in non enforceable General Information Section of USP
    • TVB may only indicate a fraction of viable organisms present
usp purified water system feed water analysis13
USP Purified Water System – Feed Water Analysis
  • Regulated Items - Testing
    • Municipality?
    • Pharmaceutical Facility?
    • Compliance?
    • Obligation?
    • Consequences?
usp purified water system periodic monitoring
USP Purified Water System – Periodic Monitoring
  • General Monitoring – Storage and Distribution System
    • Point-of-Use TVB
    • Online Conductivity
    • Online TOC
usp purified water system periodic monitoring16
USP Purified Water System – Periodic Monitoring
  • General Monitoring – Water Purification System
    • Final TVB
    • Inline RO Feed Water and Product Water Conductivity plus % Rejection of Ions
    • Inline Post RO Polishing Conductivity
usp purified water system periodic monitoring17
USP Purified Water System – Periodic Monitoring
  • Frequent Monitoring – Water Purification System
    • Silt Density Index (Test Kit)
    • Total Hardness (Test Kit)
    • Chlorine (Test Kit)
usp purified water system periodic monitoring18
USP Purified Water System – Periodic Monitoring
  • Less Frequent Monitoring – Water Purification System
    • Inline ORP for Reducing Agent Injection Monitoring
    • Inline Total Hardness Monitor
    • Inline Chlorine Monitor
usp purified water system periodic monitoring21
USP Purified Water System – Periodic Monitoring
  • Summary
    • Monitoring of Pretreatment and Ion Removal steps identifies a problem before it effects point-of-use values.
    • Frequency of the monitoring program established for each application
    • Regulatory concerns
usp purified water system sanitization provisions
USP Purified Water System –Sanitization Provisions
  • Frequency
    • Determined by microbial monitoring
    • Must include storage, distribution, ion removal, and pretreatment
    • Employs chemical and thermal methods
    • Ineffectiveness of Steam
    • Biofilm requires chemical sanitizing agent
usp purified water system sanitization provisions24
USP Purified Water System –Sanitization Provisions
  • Fundamentals
    • TVB destruction a function of concentration and time for chemical sanitization
    • TVB destruction a function of temperature and time for hot water with 65°C lowest temperature
    • Dead Leg for thermal sanitization
    • Dead leg for chemical sanitization
usp purified water system sanitization provisions25
USP Purified Water System –Sanitization Provisions
  • Fundamentals
    • Removal of Biofilm
    • Activated Carbon Issues
    • RO Waste Recirculation Issues
    • Pretreatment and Ion removal Recirculation Issues
    • Hot water sanitizable ion removal systems
    • Pretreatment must be included
usp purified water system sanitization provisions26
USP Purified Water System –Sanitization Provisions
  • Execution - Pretreatment
    • Hot Water Sanitizable Activated Carbon
    • Chemical Sanitization with 1% solution of Hydrogen Peroxide and Peracidic Acid (except activated carbon unit)
    • Replace activated carbon media every 6-12 months
    • Dynamic-Stagnant-Dynamic Procedure
usp purified water system sanitization provisions27
USP Purified Water System –Sanitization Provisions
  • Execution – Ion Removal
    • Continuous operation (make-up and recirculation)
    • Hot Water Sanitization Provisions (entire system)
    • RO membrane rotation every 6 months
    • Chemical Sanitization with 1% solution of Hydrogen Peroxide and Peracidic Acid annually
    • Dynamic-Stagnant-Dynamic Procedure
usp purified water system sanitization provisions28
USP Purified Water System –Sanitization Provisions
  • Execution – Storage & Distribution
    • Ozonation
    • Periodic Hot Water
    • Membrane Filtration discouraged
    • Chemical Sanitization with 1% solution of Hydrogen Peroxide and Peracidic Acid annually
    • Dynamic-Stagnant-Dynamic Procedure
validation criteria30
Validation Criteria
  • Commissioning Documentation
    • Reference in IQ and OQ
    • “Credit” for inspection and testing
    • Factory Acceptance Test (FAT) Documentation
    • Turnover Packages (TOP)
    • Coordination
    • Interface
validation criteria31
Validation Criteria
  • IQ Format
    • Unit operation based with all support documentation for components and accessories verified. Support documents in document or as an appendix/attachment. Provides understanding of component by individuals preparing, reviewing, and executing IQ
    • Component based program for items such as valves, gauges, pumps, etc. Poor tool for individuals to understand the system.
validation criteria32
Validation Criteria
  • IQ Information
    • Limits on material? The more information available, the better. If a accessory breaks, it must be replaced. The model number, serial number, and/or manufacturer may change or no longer exists. “Cut sheets” of accessories provide an excellent vehicle for identifying a “like-for-like” replacement which significantly reduces the “Change Control” effort.
validation criteria33
Validation Criteria
  • IQ Information
    • All support information should reference the original manufacturer’s part number. Project specifications should clearly state that the name of the manufacturer as well as the part number be provided. The vast majority of this information is “coded” to the water purification equipment manufacturer’s model number, useless for replacement on a “like-for-like” basis.
validation criteria34
Validation Criteria
  • OQ Information
    • Prepared and executed in an integrated basis. Individual Unit Operation will impact the operation of other components.
    • Execution must provide exact operating condition. As an example, if media is not installed in a pretreatment component during execution of a FAT, execution (partial) may be required after installation and start-up.
validation criteria35
Validation Criteria
  • OQ Information – Considerations
    • Fixed alarm and operating set points versus adjustable set points
    • Processor access levels
    • Alarm set points and time delays
    • Control set points and time delays
    • View screen navigation
    • “ALERM” banner display
    • “OPERATOR OVERRIDE” banner display
validation criteria36
Validation Criteria
  • PQ Criteria
    • Post start-up and commissioning
    • 30 day sample period
    • Sampling plan to duplicate water use
      • “Working days”
      • Attempt to duplicate water demand
      • Attempt to duplicate actual conditions at individual points-of-use
validation criteria37
Validation Criteria
  • PQ Criteria
    • Every point-of-use every day if practical
    • TOC “grab” samples from each points-of-use
    • Conductivity “grab” samples from points-of-use
    • Suggest transition for about 30-60 days after successful execution
    • Continues for one year period
    • Monitoring never stops
validation criteria38
Validation Criteria
  • PQ Microbial Monitoring
    • Duplicate sampling schedule over length of intense monitoring program and less frequently thereafter
    • Different agar (PCA versus R2A)
    • Different incubation temperatures (22°C and 30-35°C)
    • Extended incubation time period (3, 5, 8, and 10 days)
validation criteria39
Validation Criteria
  • PQ Microbial Monitoring
    • EP Monograph Reference
    • Verify enumeration parameters
    • Bacteria identification
      • MIS
      • Riboprinter
    • Gram Stain
    • Objectionable organisms
    • Summary Report
standard operating procedures
Standard Operating Procedures
  • General Considerations
    • Prepared, reviewed, and accepted before OQ execution
    • Verbatim compliance
    • Keep as concise as possible
    • Do not include maintenance procedures
    • “Control” of copies important
    • Formal training
standard operating procedures42
Standard Operating Procedures
  • General Considerations
    • Video tape training sessions
    • Training Manuals
    • System P&IDs mounted in water system area
    • Documentation of individual attending training sessions
    • Periodic retraining
    • Personnel incident/excursion retraining
preventative maintenance program44
Preventative Maintenance Program
  • Objective

- Proactive not reactive

- Shutdown Considerations – frequency

- Cost of lost production time

- Cost of quarantine of product

- Cost of lost product

- “Micro delay”

preventative maintenance program45
Preventative Maintenance Program
  • Pretreatment Component Example – Activated Carbon Unit
preventative maintenance program46
Preventative Maintenance Program
  • Ion Removal Component Example – Reverse Osmosis Unit
preventative maintenance program47
Preventative Maintenance Program
  • Ion Removal Component Example – Reverse Osmosis Unit
preventative maintenance program48
Preventative Maintenance Program
  • Storage & Distribution Loop Example – USP Purified Water Storage Tank (No Ozone)
preventative maintenance program49
Preventative Maintenance Program
  • Ion Removal Component Example – Reverse Osmosis Unit
thank you

Thank you!

Questions?

ad