aim frb briefing strategic systems programs ssp l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
AIM FRB Briefing Strategic Systems Programs (SSP) PowerPoint Presentation
Download Presentation
AIM FRB Briefing Strategic Systems Programs (SSP)

Loading in 2 Seconds...

play fullscreen
1 / 11

AIM FRB Briefing Strategic Systems Programs (SSP) - PowerPoint PPT Presentation


  • 183 Views
  • Uploaded on

AIM FRB Briefing Strategic Systems Programs (SSP). Briefer: Jamie Swaim Billet: Personnel Program Coordinator Learning Center: SLC Date: 11/04/08. Use of Traditional AIM I LP/TG Content. ILT materials are maintained in Central Site AIM I, which is hosted by NAVAIR Orlando.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'AIM FRB Briefing Strategic Systems Programs (SSP)' - salali


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
aim frb briefing strategic systems programs ssp

AIM FRB BriefingStrategic Systems Programs (SSP)

Briefer: Jamie Swaim

Billet: Personnel Program Coordinator

Learning Center: SLC

Date: 11/04/08

use of traditional aim i lp tg content
Use of Traditional AIM I LP/TG Content
  • ILT materials are maintained in Central Site AIM I, which is hosted by NAVAIR Orlando.
  • Courses are exported to SCORM V1.2 and imported into Elite.
top five aim change requests acrs
Top Five AIM Change Requests (ACRs)
  • 1. AIM-I-2003-002: Add RRL, OAC, and FAL to HTML output.
  • 2. AIM-I-2004-003: Add ability to create changes to RRL items.
  • 3. AIM-I-2007-001: Include TG graphics that were embedded in Word in SCORM output.
  • 4. AIM-I-2008-002: Allow simultaneous editing of TCCD, COI, and LP/TG.
  • 5. AIM-I-2008-004: Add Developing Authority functionality to LO module.
electronic classroom and ilt delivery
Electronic Classroom and ILT Delivery
  • All ECs are connected to a central server, which contains the Elite courses, IETMs, IMIs, and Training Assets Menu.
  • The EC Instructor stations are dual-monitored for simultaneous viewing presentation materials and staging of materials for broadcast to Student stations.
  • Materials are sent to Student stations from the Instructor station using Robotel.
jta nja data and process
JTA/NJA Data and Process

SME Panel

(SME, SLC, TYCOM, SSP, Fleet)

Develops integrated OCCSTDS/NJA

OCCSTDS WG

Pulled NJA data out and created OCCSTDS update

OCCSTDS Review/

Approval Process

Reviewed and approved

SSP and SLC

SSP has:

  • Revised OCCSTDS
  • Re-developed NJAand OCCSTDS
  • Uploaded NJA intoCPM (R&D site) from Excel spreadsheets
  • Sent refreshed OCCSTDS for NAVMAC review

MT 3 OCCSTDS

Operator NJA

Skill Group

(KSAs)

Tasks

(KSAs)

Subtasks

(KSAs)

Steps

(KSAs)

Functional

Area

Tasks

MT 2 OCCSTDS

Functional Area

Tasks

MT 1 OCCSTDS

Technician NJA

Functional Area

Tasks

MTC OCCSTDS

Manager NJA

Functional Area

Tasks

ile projects and cpm lo module
ILE Projects and CPM/LO Module
  • MT Continuum
    • MT Continuum Overview
    • Development Process
mt continuum process lessons learned
MT Continuum Process Lessons Learned
  • Need to be able to update AIM data with changes made in final development (As Designed = As built) for maintenance of content.
  • AIM automatic metadata needs better definition process to make more effective.
  • Must have a “GOTS” product do the “finishing work”—or else minor changes require going back to developer EVEN if you have the source files.
  • Need a Configuration Management toolset to control final product AND source files. (CMAD did NOT do this, and now no toolset is planned to accomplish).
top five aim cpm frm items
Top Five AIM/CPM FRM Items
  • 1. (Multiple FR items): Change Compare Report – surveillance needs are high and more costly than initial development.
  • 2. (Multiple FR items): Work flow (approval) – ensures CM.
  • 3. (4.2.4.3): Import open XML into LO Module from other applications – supports maintaining as designed data (LO Module) = as built data (other app).
  • 4. (4.2.4.9): Import option to overwrite existing material or not – supports maintenance.
  • 5. (4.2.3.41): Build NLOS from existing NLOS and maintain links to existing content AND utilize the same ELO in LO Module – supports content re-use
slide11

Points of ContactJamie Swaim703.313.0360 or jamie.swaim@sp15.chenegafederal.comRichard Garrison301.685.3275 orrichard@garrisonconsulting.biz