If you decide incorrectly, you will end up messing up the entire renovation plan. With the passage of time both the kitchen cabinets and flooring has undergone a lot of wear and tear. It is equally important to renovate both these two things so that your kitchen looks grander and new. We recommend that you get the cabinets replaced first so that no matter whatever happens there is zero chance of damaging the floor.

Download Presentation

What Should You Do First - Cabinet Replacement or the Flooring Work of Your Kitchen

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. What Should You Do First - Cabinet Replacement or the Flooring Work of Your Kitchen? When you are renovating your kitchen what should you do first - replace the existing cabinets with new ones or should you get the flooring done first? This is a tricky question. If you decide incorrectly, you will end up messing up the entire renovation plan. With the passage of time both the kitchen cabinets and flooring has undergone a lot of wear and tear. It is equally important to renovate both these two things so that your kitchen looks grander and new. We recommend that you get the cabinets replaced first so that no matter whatever happens there is zero chance of damaging the floor. When the cabinetwork is going on in the kitchen, no matter how careful you are, there is always a chance that you can damage the flooring. So, It is better to get the cabinetwork done over the old flooring. Once the cabinets are made and installed, you can proceed with the flooring. Moreover, removing the old floor tiles, cleaning the place and installing the new floor tiles will always take more time than installing the new cabinets. Hence, it is best to get one work done before you go to the next. When you get in experts find out how many days they will take to make the new cabinets and install them and when will the flooring work get done. At the same time, you need to find out about the total cost involved as well. Working with experts for professional building Port Lincoln is always the best solution. You can rely on them for their expertise and skills. At the same time, they will use the latest tools and technologies to carry out the work.

  2. Once the kitchen renovation is complete, you can proceed with the other renovation works in the house. You should leave the bathroom renovation for the last. What are you waiting for? Get in touch with the experts to collect all the data and get the needful done. With the passage of time, the condition of the property goes down. If you don’t opt for timely repair and maintenance you are not taking proper care of your property. Soon cracks will start to develop and since you have not taken any care of the property, renovation work will be costly. If you try to sell it off without any repair work you will not get a good amount as well.