John Roberts Deputy District Engineer for Project Management Tulsa District July 26, 2011. SAME San Antonio Post Small Business Conference. Tulsa District. Small Business. US Business US SB SB Goal SB Achieved. Type of SB Dollars Dollars

Download Presentation

SAME San Antonio Post Small Business Conference

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. John Roberts Deputy District Engineer for Project Management Tulsa District July 26, 2011 SAME San Antonio PostSmall Business Conference

  2. Tulsa District

  3. Small Business US Business US SB SB Goal SB Achieved. Type of SB DollarsDollars $116,292,580 $61,615,376 40% 52.98% Small Business $116,292,580 $41,260,683 20% 35.48% SDB $116,292,580 $16,956,362 14.58% 8(a)* $116,292,580 $37,038,294 20% 31.85% Hubzone $116,292,580 $5,654,955 3% 4.86%SD/VOSB $ 116,292,580 $7,814,863 6.5% 6.81% WOSB 0% 0% 0% 0% HBCU/MI

  4. Uncertain Times • Civil Works budget impacted by Mississippi/Missouri flooding damage repairs • Completion of BRAC/reduced MILCON • National Priorities/Debt Challenges

  5. Upcoming Contracting Opportunities

  6. Altus AFB FY 2011 and 2012 Projects ProjectScheduleProject Amt Dorm Renovation/Repairs FY11, FY12, & FY13 1-15M, 1 dorm per year Main Gate Entry Control Point FY12 (proposed insert) 1-15M KC-46A Tanker Deployment FY12 (proposed insert) Not yet fully developed

  7. Fort Sill FY 2012 Projects that are not planned for existing MATOCs Project RTA / Award $PA Ft Sill BT Reception Complex (Ph 1) Sep 2011 / Mar 2012 1-50M Ft Sill Mission Command Training Center Sep 2011 / Mar 2012 1-50M Ft Sill THAAD Instruction Facility Sep 2011 / Mar 2012 1-50M Ft Sill Rail Deployment Facility Dec 2011 / May 2012 1-5M O&M Projects (40) FY 12 250K – 1M

  8. Vance AFB FY 2011 and 2012 Projects ProjectScheduleProject Amt No new starts of proposed MILCON or SRM funded projects in FY11 or FY12. Insert Picture of Construction Project

  9. Tinker AFB Project RTA / Award $PA O&M Projects (40) FY 12 10-50M KC-46A Facilities ?? ??

  10. Environmental Program • FY12 - Small Business MATOC acquisition for Environmental Services at Fort Bliss. This contract is valued at $30M and will need to be awarded by the end of October 2011 so the solicitation will be coming out in FY11.

  11. Maintenance and repair of hydraulic steel structures • Dam Safety and Levee Rehabilitation • Bridge rehabilitation/repair/replacement • Road repair and maintenance • Public Use Area maintenance and upgrades • Hydropower projects • Chloride Control Pump houses, pipelines • Various Continuing Authority Projects FY11-14 Civil Works Program

  12. Canton Dam Safety Project The Canton Dam Safety project consists of stabilizing the existing spillway with steel anchors (complete) and constructing an additional auxiliary spill way channel (in progress). The projects are required to resolve stability, seepage, seismic, and hydrologic deficiencies on the dam. FY 2011 Scheduled Projects ProjectProject Amount AWARD WEIR AND FUSE GATE CONTRACT $ 25-50M (proposals received – potential subcontracting opportunity)

  13. Augusta Levee • This small flood control project in Augusta, Kansas raises and extends the existing levee. This 21 July 2011 solicitation is set aside for Service-Disabled Veteran Owned Small Business (SDVOSB) and closes 19 August 2011. Work includes earthwork, concrete structures, steel structures, placement of pumps, procurement of metal storage buildings and paving. ProjectSchedule Project Amount Raise and Extend Existing Levee September 2011 $ 5-10M

  14. Small Business Opportunities • - 5-10 POCA Contracts $ 3M • - Establishing a Small Business Woman Owned MATOC

  15. Future Projects • Dam Safety Modification • Hydropower Modernization • Recreation Initiatives • Military O&M • Water Supply • Reservoir Sustainability

  16. Tulsa District Small Business POC: Linda Morris 918-669-7280 Southwestern Division Small Business POC: Melea Crouse 469-487-7105 SWT website –https://www.swt.usace.army.mil Tulsa District Chief of Contracting: Brian Brobson Contracting Division Central Telephone Line: 918-669-7270 FEDBIZOPPS: www.fbo.gov Additional Information