Learning objectives

Learn about the importance of software metrics and how they can be collected and used to measure characteristics of a software system or the software development process. Explore different types of metrics, such as product metrics and process metrics, and their relevance in various phases of software development. Discover how metrics can aid in decision-making and planning, and overcome common issues associated with collecting and interpreting metrics.

reggiep
Download Presentation

Learning objectives

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Learning objectives • Software metrics • Metrics for various phases • Why metrics are needed • How to collect metrics • How to use metrics

  2. Questions • How big is the program? • Huge!! • How close are you to finishing? • We are almost there!! • Can you, as a manager, make any useful decisions from such subjective information? • Need information like, cost, effort, size of project.

  3. Metrics • Quantifiable measures that could be used to measure characteristics of a software system or the software development process • Required in all phases • Required for effective management • Managers need quantifiable information, and not subjective information • Subjective information goes against the fundamental goal of engineering)

  4. Kinds of software metrics • Product metrics • quantify characteristics of the product being developed • size, reliability • Process metrics • quantify characteristics of the process being used to develop the software • efficiency of fault detection

  5. CMM • Level 4: Managed level • Process measurement performed • Quality and productivity goals set • Continually measured and corrective actions taken • Statistical quality controls in place • Level 5: Optimizing level • Statistical quality and process control in place • Positive feedback loop used for improvement in productivity and quality

  6. Issues [1] • Cost of collecting metrics • Automation is less costly than manual method • CASE tool may not be free • Development cost of the tool • Extra execution time for collecting metrics • Interpretation of metrics consumes resources • Validity of metrics • Does the metric really measure what it should? • What exactly should be measured?

  7. Issues [2] • Selection of metrics for measurement • Hundreds available and with some cost • Basic metrics • Size (like LOC) • Cost (in $$$) • Duration (months) • Effort (person-months) • Quality (number of faults detected)

  8. Selection of metrics • Identify problems from the basic metrics • high fault rates during coding phase • Introduce strategy to correct the problems • To monitor success, collect more detailed metrics • fault rates of individual programmers

  9. Utility of metrics • LOC • size of product • take a regular intervals and find out how fast the project is growing • What if # defects per 1000 LOC is high? • Then even if the LOC is high, most of the code has to be thrown away.

  10. Applicability of metrics • Throughout the software process, like • effort in person-months • staff turnover • cost • Specific to a phase • LOC • # defects detected per hour of reviewing specifications

  11. Metrics: planning • When can we plan the entire software project? • At the very beginning? • After a rapid prototype is made? • After the requirements phase? • After the specifications are ready? • Sometimes there is a need to do it early.

  12. Metrics: planning • graph of cost estimate 4 3 Relative range of cost estimate 2 Requirements Specifications Design Implementation Integration Phase during which cost estimation is made

More Related