Hydrosystem Operations and Fish Recovery in the Columbia River Basin U.S. Army Corps of Engineers Northwestern Division June 19, 2008. Today’s Discussion. Federal Columbia River Power System (FCRPS) Remand Process The Columbia Basin Fish Accords Key Biological Opinion Actions.

reeves
Download Presentation

Today’s Discussion

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hydrosystem Operations and Fish Recovery in theColumbia River BasinU.S. Army Corps of EngineersNorthwestern DivisionJune 19, 2008

  2. Today’s Discussion • Federal Columbia River Power System (FCRPS) Remand Process • The Columbia Basin Fish Accords • Key Biological Opinion Actions

  3. 2008 FCRPS Remand Process • Product of two years of collaboration among four federal agencies, four Northwest states and seven Northwest tribes. • Comprehensive biological analysis for each listed stock and “population” • Historical trends • Current condition • Benefits of proposed actions in all Hs • Goal is trend to recovery

  4. 2008 FCRPS Remand Process(continued) • Juvenile in-river survival is nearly three times higher than it was in the mid-to-late 1970s. • Adult migration rate and travel time are similar to levels before the Snake River dams were completed.

  5. Bonneville Dam1995–1999 Route of Passage Survival Estimates for Yearling Chinook Bonneville 2 B2 survival = 90% Corner Collector Survival = N/A Spillway survival = 98% Spillway Bonneville 1 B1 survival = 90% Estimated Dam Survival 91.7% Route Specific Survival Estimates from PATH Report and 2000 BiOp Spring Spill Operations: 75 kcfs day/ 120 kcfs (Gas Cap) night

  6. Bonneville Dam2004 & 2005 Route of Passage Survival Estimates for Yearling Chinook Bonneville 2 B2 Bypass survival = 98.9% B2 Turbine survival = 95.8% Spillway survival = 92.0% Spillway Corner Collector Survival = 100.0% Combined Turbine & Sluiceway survival = 93.1% Bonneville 1 Estimated Dam Survival 95.9% Spring Spill Operations: 100 kcfs 24 hrs/day Counihan et al. Final report by USGS

  7. 2008 FCRPS Remand Process(continued) • All H approach (Hydro, Habitat, Hatcheries, Harvest) with significant actions on predation management • Reasonable and Prudent Alternative that includes 73 Actions • Includes Adaptive Management provisions including extensive RM&E program • Annual progress reports and check-ins at 2013 and 2016 will contain diagnostic analyses • Continued collaboration with states and tribes

  8. Columbia Basin Fish Accords Signed May 2, 2008

  9. Columbia Basin Fish Accords • Signed Accords with • Confederated Tribes of the Umatilla Indian Reservation • The Confederated Tribes of Warm Springs • Yakama Indian Nation • Confederated Tribes of the Colville Reservation • Columbia River Inter-Tribal Fish Commission • Montana • Idaho Costs over 10 years • $900 million incurred by the Bonneville Power Administration • $50 million from the Corps of Engineers for Pacific lamprey Significant Benefit • Hundreds of “on the ground” habitat projects based on recovery plans with demonstrated biological benefits • New hatchery actions to promote recovery and regional fisheries, without impeding recovery of listed fish.

  10. 2008 FCRPS Biological Opinion • Flows • Spill and transport operations timed to the needs of individual species • Expanded habitat program • Expanded predation-management program • Timetable and commitments for site-specific hatchery reforms • Specific mainstem hydro improvements

  11. Flows • Flow augmentation similar to 2000 BiOp, except for: • Implementation of summer operations at Libby and Hungry Horse dams recommended by the State of Montana • Work on dry water year strategy for Grand Coulee Dam • John Day – Operate John Day pool at the lowest elevation that continues to allow irrigation from April 10 through September 30. • Lower Snake – Operate at minimum operating pool (MOP) elevation from April 3 until small numbers of juvenile migrants are present unless adjusted to meet authorized project purposes.

  12. Spill Operations • Spring • 24-hour spill at all projects • Lower Snake collector projects–spill ceases for two weeks in May for transport of steelhead • Continue testing of spill as new surface collectors come online • Earlier transition from spring to summer spill • Summer • Similar spill levels as in 2006–2008 • Snake River projects–Cessation of spill in August when few fish are present (300–500)

  13. Juvenile Fish Transportation Program • Spring Chinook typically benefit from transportation after approximately April 20 • Steelhead typically benefit from transport throughout the season • Fall Chinook research is in progress • Sockeye has too little data to tell

  14. Future Hydro Improvements $500 million over 10 years • Commitment to higher dam passage performance standards: • 96% average or better survival for spring migrants • 93% average for summer migrants • Scheduled commitments to additional surface collectors (RSWs/TSWs) • Improvements to juvenile bypass systems

  15. Idaho Lower Columbia and Snake River Dams Washington River Juvenile Surface Passage Improvements Columbia Lower Monumental 2008 Little Goose 2009 Ice Harbor 2005 The Dalles Spillway Improvements 2004, New spill wall 2010 Pacific Ocean Columbia River Lower Granite 2001 McNary 2009-2012 Snake Bonneville 2004 John Day 2008-2012 Oregon = Transport Facilities River (all dates subject to change)

  16. Surface Collection Advantages • Fish pass at normal vertical distribution • Reduce forebay delay • Improved efficiency for passage • Potential improvement in total dissolved gas • Kelt passage

  17. Surface BypassSpillway Weirs

  18. Spillway Weirs McNary Dam

  19. Litigation: NWF v. NMFS, Corps, & Reclamation • Remand completed with issuance of 2008 BiOp on May 5 • Court-ordered hydro operations remain in effect until Aug 31, 2008 • NWF et al. filed complaint against NMFS with U.S. District Court of Oregon, challenging new BiOp • Plans to sue Corps and Reclamation challenging compliance with ESA and CWA • Briefing on the merits will begin mid-summer; schedule is being set to allow time for preliminary injunction hearing before the end of calendar year • Anticipate PI to be broader in scope than mainstem spill operation

  20. Questions ?

  21. Initial Spill Operations under the new BiOp

  22. Resulting Transport Operations • Spring Operations • Spill and Bypass April 3 – April 20 • Spill and Transport April 21 – May 6 • Maximized Transport May 7 – 20 • Resume Spill and Transport May 21 ~ June 1 or until Fall Chinook predominate • Summer Operations • Spill and Transport (~June 1 ~ Aug 31) • In August, spill will be curtailed after Aug 1 when fewer than 300 juvenile fall Chinook per day are collected